The three uploaded files were parsed and reconciled as the authoritative Revision A specification. The current project was audited and confirmed obsolete/incomplete, with legacy buttons/OLED/fan nets and missing timer, optical-state, BOM, isolation, and verification work.
No project changes were applied because no ACUs are available. All schematic corrections, documentation, ERC/isolation validation, PCB layout/routing, DRC, and 3D handoff remain pending.