Consolidated manufacturability analysis and prioritized recommendations:
1) Duplicate GND nets: Multiple nets named "GND" exist — merge into a single GND net so all shield and GND pins share the same return. This is critical to avoid split returns and EMI issues.
2) VBUS protection & placement: Place F1 (PTC/fuse) and the dedicated VBUS TVS as close as possible to J1 VBUS pads. Keep the VIN trace from J1 to U2 <5 mm and as short/wide as practical.
3) USB data protection & routing: Ensure bidirectional TVS on D+ and D- has ≤1 pF capacitance per line. Place the common‑mode choke (L1) immediately after J1, with the differential pair routed continuously through it. Minimize stubs to TVS/CM choke.
4) Differential pair integrity: Route D+ / D- as a matched-length controlled-impedance differential pair (target ~90 Ω diff), consistent spacing, length-matched, with no unnecessary vias; verify settled lengths for USB2.0 timing.
5) LDO decoupling & EP stitching: Place VIN decoupling (C1) and VOUT decoupling (C2/C3) immediately adjacent to U2 VIN/VOUT pins with short traces and ground vias. Verify C type/values meet XC6220B331MR stability and transient requirements. Connect U2 exposed pad to ground plane with multiple thermal/ground vias and stitching around RF area.
6) Antenna & RF keepout: Enforce antenna keepout region, route RF feed as a 50 Ω transmission line (microstrip/stripline per stackup), avoid copper pours under antenna, and maintain required clearances from mounting holes and metal. Add stitching vias at ground plane edges near RF as needed.
7) SWD/programming accessibility: Ensure J2 is physically accessible; keep SWDIO, SWDCLK, and nRESET traces short and avoid vias where possible for reliability during programming.
8) Footprints & assembly: Verify all footprints, pad sizes, solder mask, and courtyard clearances for manufacturability; ensure board-edge USB-C mechanical clearance and pick-and-place access; include fiducials.
9) ERC/DRC checks: Run full ERC/DRC for missing footprints, airwires, overlapping copper, trace-to-pad clearances, minimum trace widths, and copper in antenna keepout. Fix high-priority items before fabrication.
Prioritized next actions:
1) Merge duplicate GND nets (critical).
2) Re-locate/confirm placement of F1, TVS (VBUS), and L1 at J1 (high).
3) Verify LDO decoupling placement, component values, and EP stitching for U2 (high).
4) Review USB D+/D- differential routing and verify TVS capacitance <1 pF (high).
5) Validate antenna keepout and 50 Ω feed geometry (medium).
6) Run ERC/DRC and iterate on layout to resolve any remaining DRC/assembly issues (medium).
End of manufacturability_review.