The current PCB layout is not yet manufacturing-ready, so these are budgeting quotes—not an order recommendation yet. Placement, routing, DRC, BOM availability and mechanical fit must be completed before purchasing.
I’m closing the remaining manufacturing gates now: live layout audit, placement, routing, final DRC/ERC, and fabrication package if the board reaches a clean state.
Worked for 13 mins 26 sec
1 day ago
"PCB Placement Done" completed.
Thought for 4 sec
flux
1 day ago
Placement advanced substantially: all 245 components are now inside the 160 × 100 mm board, 37 overlaps were cleared, and all three switching-regulator stages pass their required placement checks.
Remaining work
Resolve 3 component overlaps.
Repair U1’s self-intersecting antenna keepout.
Review the microSD edge-offset warning and three L4 pad-access advisories.
Generate neckdowns and protected USB-C breakout.
Route the PCB and run final DRC/ERC.
Export Gerbers, BOM, and pick-and-place files only after DRC is clean.