ESP32-S3 System Design Inquiry
2:46
Using Knowledge Base Tool.
Using Schematic Tool.
2:24
Using Knowledge Base Tool.
Started implementing a plan
#Goal
- Fully connect the TPS63020 (U2) buck-boost converter and correct the surrounding power paths to ensure that the 3.3V rail is valid, stable, and reliable for all connected loads in the ESP32-S3-PICO-N2R8 Qi-powered camera system.
#Implementation plan
1. Correct Power Path Nets
1. Disconnect SYS from U1:IN and keep U7:BAT feeding only U1:IN.
2. Isolate U1:OUT as the SYS rail and verify that it exclusively feeds U2:VIN.
2. Fully Connect U2 (TPS63020) per the Datasheet
1. Add the inductor between the appropriate pins (L1/L2) as recommended.
2. Implement the feedback (FB) divider circuit to generate the 3.3V output from U2:VOUT.
3. Tie U2:EN to the SYS rail with an appropriate pull-up resistor.
4. Configure the PS/SYNC and PG pins of U2: ensure a pull-up is added on PG.
5. Connect AGND and PGND appropriately.
6. Place decoupling capacitors (100 nF and 10 µF) at VIN and VOUT for proper regulation and noise suppression; also ensure any additional VINA decoupling per datasheet guidance.
3. Distribute the 3.3V Rail
1. Connect U2:VOUT to the rest of the loads including U4 (ESP32-PICO-D4), U5 (OV2640), U6 (Adafruit ST7789 TFT), U3 (MAX17055), pull-ups, and test points.
4. Clean Decoupling and Unused Components
1. Place a local 100 nF capacitor at each critical IC (ESP32, OV2640, ST7789, MAX17055).
2. Retain the bulk rail decoupling capacitors as needed and remove any stray or unused capacitors (C1–C12) that are not correctly connected.
5. Final ERC and Schematic Verification
1. Review the schematic ensuring all non-connected pins on U2 and other ICs are correctly connected.
2. Run ERC to confirm that there are no errors and that the complete power network is compliant with design guidelines.
#Success criteria
- The TPS63020 (U2) is fully connected per its datasheet recommendations including proper inductor, FB divider, EN, PG, and PS/SYNC connections with appropriate decoupling.
- The power path is corrected so that the SYS rail (U1:OUT) exclusively feeds U2:VIN and supplies 3.3V to U4, U5, U6, U3, and associated test points, with no accidental ties to U1:IN.
- The decoupling scheme is optimal with local caps at each IC and no stray unused components.
- Electrical Rule Check (ERC) passes with no errors related to U2 and power nets.
Started implementing a plan
#Goal
- Fully connect the TPS63020 (U2) buck-boost converter and correct the surrounding power paths to ensure that the 3.3V rail is valid, stable, and reliable for all connected loads in the ESP32-S3-PICO-N2R8 Qi-powered camera system.
#Implementation plan
1. Correct Power Path Nets
1. Disconnect SYS from U1:IN and keep U7:BAT feeding only U1:IN.
2. Isolate U1:OUT as the SYS rail and verify that it exclusively feeds U2:VIN.
2. Fully Connect U2 (TPS63020) per the Datasheet
1. Add the inductor between the appropriate pins (L1/L2) as recommended.
2. Implement the feedback (FB) divider circuit to generate the 3.3V output from U2:VOUT.
3. Tie U2:EN to the SYS rail with an appropriate pull-up resistor.
4. Configure the PS/SYNC and PG pins of U2: ensure a pull-up is added on PG.
5. Connect AGND and PGND appropriately.
6. Place decoupling capacitors (100 nF and 10 µF) at VIN and VOUT for proper regulation and noise suppression; also ensure any additional VINA decoupling per datasheet guidance.
3. Distribute the 3.3V Rail
1. Connect U2:VOUT to the rest of the loads including U4 (ESP32-PICO-D4), U5 (OV2640), U6 (Adafruit ST7789 TFT), U3 (MAX17055), pull-ups, and test points.
4. Clean Decoupling and Unused Components
1. Place a local 100 nF capacitor at each critical IC (ESP32, OV2640, ST7789, MAX17055).
2. Retain the bulk rail decoupling capacitors as needed and remove any stray or unused capacitors (C1–C12) that are not correctly connected.
5. Final ERC and Schematic Verification
1. Review the schematic ensuring all non-connected pins on U2 and other ICs are correctly connected.
2. Run ERC to confirm that there are no errors and that the complete power network is compliant with design guidelines.
#Success criteria
- The TPS63020 (U2) is fully connected per its datasheet recommendations including proper inductor, FB divider, EN, PG, and PS/SYNC connections with appropriate decoupling.
- The power path is corrected so that the SYS rail (U1:OUT) exclusively feeds U2:VIN and supplies 3.3V to U4, U5, U6, U3, and associated test points, with no accidental ties to U1:IN.
- The decoupling scheme is optimal with local caps at each IC and no stray unused components.
- Electrical Rule Check (ERC) passes with no errors related to U2 and power nets.
Working...
Show Plan
Reviews
Component | |
|---|---|
Des | Net | Des | Net | ... | |
|---|---|---|---|---|---|
None | |||||
None | |||||
None | |||||
None | |||||
None | |||||
None | |||||
None | |||||
None | |||||
None | |||||
None | |||||
None |
Designators | Net | |
|---|---|---|
Inspect
Patient Amber Heat-Ray
Controls
Properties
Availability & Pricing
| Distributor | Qty 1 | |
|---|---|---|
| Arrow | $5.87–$7.41 | |
| Digi-Key | $9.50–$14.78 | |
| LCSC | $16.76 | |
| Mouser | $20.07 | |
| TME | $23.63 | |
| Verical | $4.44–$5.87 | |
Assets
Welcome 👋
Flux helps you build PCBs faster with an AI teammate!
Create your account to collaborate, stay updated, fork your own version, and get instant answers from our AI agent.