Estimate: ~25–45 ACUs to finish a credible 12 mm hook redesign pass.
Breakdown:
- Apply 12 mm crescent outline + 4-layer stackup: 2–5 ACUs
- Research/replace compact USB-C + high-SPL mics + smaller flash/switch/connectors: 6–12 ACUs
- Re-place dense two-sided hook layout: 8–15 ACUs
- Fit/congestion/layout verification: 4–8 ACUs
- Update project docs and next-step notes: 2–5 ACUs
If we also route the board afterward, budget another 40–90 ACUs, because fine-pitch nRF5340/CS47L63, RF, USB, and dense wearable placement will likely need multiple iterations.