Project Getting Started
Waiting for input
Table
| Finding | Result |
|---|---|
| Off-domain UART/I2S inputs could float | Corrected with U17/U18 and R13–R22; focused independent verification passed static topology. Ramp/leakage/SI tests still required |
| Mic SD receiver bias | R10 retained whenever U13 populated; existing metadata corrected |
| Former TTL receive/idle | Motor RX driver and R23 removed;TTL_DATA is passive J6/TP5 only. External U2D2/motor powered-off leakage and actual bus behavior remain unvalidated |
| Host200Hz/full-snapshot bandwidth conflict | ABI clarified: internal200Hz snapshots,20Hz default/50Hz maximum wire publication at1152008N1;84-byte payload and≤94-byte framed packet. Remaining misleading labels corrected |
| Face isolation incomplete | U4 VCCB unsourced, EN low; four-wire harness lacks actual head3V3 reference. Intentionally disabled, not solved |
| Critical capacitor sourcing | C7/C8/C13 remain without MPN after bounded attempts; exact effective capacitance/ESR evidence not established. No fictitious assignments |
| Battery/motor safety absent | Deferred at named bench boundaries; independent review forbids battery/motor use |
Table
| Deliverable | State | What specifically remains |
|---|---|---|
| Single custom torso architecture | Recorded and captured in part | No custom head/IMU PCB added |
| Full reviewable schematic | PARTIAL logical capture only | High-current circuitry absent; face disabled; visual drafting not performed and requires separate approval |
| Power budget/protection | Motor quantitative assessment completed; final hardware approval BLOCKED | 30A provisional envelope and options calculated in Power Budget; actual battery,current-vs-time,regen,other rail loads,harness and hot-system evidence absent; no final fuse/FET/shunt/TVS/regulator values |
| Fail-safe motor power | Not implemented | Independent normally-off high-side disconnect,latch/rearm,hardware watchdog/stop,brownout,per-cell monitor and retained motor-side energy absorption |
| Interface/pinout tables | Review tables supplied | Actual carrier/JetPack,head revision,power endpoints and cable orientation/continuity |
| Harness/mount drawings | Logical schedules only | Mating-face and wire-entry datums,contact/wire ratings,strain relief; robot CAD and purchased-revision fit missing |
| Footprint-checked complete BOM | Incomplete | C7/C8/C13 qualification,all exact geometry audits and microphone acoustic/drill/paste verification; current stock/Basic classification not fully verified |
| Two microphone variants | Documented, not generated manufacturing variants | USB_ONLY omit mic components; retainR10 ifU13 remains; populated backup not recorded/tested |
| Firmware dependencies and exact host map | Design proposal delivered | No firmware source/binary build,flash,resource/fusion timing or fault tests |
| Jetson USB/I2S audio | No tested configuration | Installed release,pinmux/device-tree/ASoC,ALSA formats,recording and simultaneous playback under fan/servo load |
| Head/display/ToF | Bought BOM,GPIO/harness/firmware proposals | Exact power/header/cable endpoints,regulator capacity,controller timing,drivers,ToF recovery and real-cable SI tests |
| Mechanical fit | Gap review only | No actual torso/head CAD; converter location,cooling,USB/CSI access,mounts,two inserts,neck swept volume and optics/acoustics unresolved |
| Four-layer layout proposal | Recorded only | Default160x100mm board is NOT approved torso envelope; no placement/routing/thermal geometry |
| ERC/DRC | ERC passes checked rules;DRC not clean | 206 airwires,3 MPN errors,50 bounds warnings,J1/J3 overlap;physical geometry not approved |
| Simulation/physical verification | Not performed | No validated simulation fixture/models established; no target hardware or physical test evidence supplied. No dynamic/thermal/audio proof |
| One manufacturing set | WITHHELD intentionally | Safety,audio,harness and fit gates remain open; no Gerbers/PnP released |
Motor-budget assessment supersession — 2026-10-22
Final disposition
Project files index
Durable detailed evidence
What is actually captured
Independent-review findings and resolution
Requirement completion ledger and specific blockers
Future power/safety topology
Four-layer and mechanical direction
Next actions and needed inputs