Project Getting Started


I reviewed the completed research handoffs and checked the live schematic and PCB. This revision is still incomplete and remains on release hold—not an approved battery-powered design.
Completed
  • Preserved the pre-change backup.
  • Recorded your CNHL 3S battery requirements and researched battery monitoring, default-off protection, auxiliary supplies and a purchased motor converter.
  • Documented integration gaps and saved the verified continuation state in the revision handoff.
What remains unresolved
  • Motor power: no battery-protection or high-current motor-power circuit was added. The proposed TRACO converter is not selected or approved: exact-model capability and low-input thermal derating remain unconfirmed. FET/shunt sizing, fuse coordination, current limits, regeneration handling, harness losses and transient/thermal validation are unfinished. The 25–30 A option remains provisional capacity—not continuous demand—and D24V150F5 remains unsuitable for unrestricted 25–30 A service.
  • Face: still disabled. U4’s head-side supply remains unsourced, and EN remains pulled low.
  • C7/C8/C13: still generic capacitors without exact qualified MPNs; effective-capacitance/ESR qualification is unfinished.
  • Integration: firmware compatibility, audio tests, exact harness drawings and mechanical fit remain incomplete. The PCB is still the unapproved 160 × 100 mm placeholder.
  • Checks: the eight ERC categories returned by my inspection passed, but this was not a complete final sign-off. DRC still reports unrouted connections. No manufacturing files were released.
What I still need from you
  • Original/restored torso and head CAD, including mounting locations and cable-clearance requirements.
  • Photos of the received battery label and balance connector; installed harness lengths and cooling conditions.
  • Where not already supplied: exact head/display and Jetson-carrier revisions, plus the target firmware repository and commit. Joint duty/torque requirements are also needed if reduced-current operation is acceptable.
You do not need to resend the motor model or battery product identity. Execution stopped because your account ran out of ACUs.

Waiting for input


Declaration of Conformity Draft
UNSIGNED PLANNING DRAFT — NOT A CLAIM OF CONFORMITY.
Proposed manufacturer: summerexe, legal entity/address unverified. Product: Microcat Torso Controller and its integrated robot system, engineering prototype Rev8. Scope: single custom torso PCB, purchased Jetson/ESP32/modules,3S battery and15 TTL actuators; full protection is not yet designed.
No directive or standard is asserted applicable without intended-market classification. Evaluate FCC Part15 for US and RED/EMC/RoHS obligations for EU as appropriate to final radio/product configuration; other-market rules require separate review. No RF/EMC/safety reports, approved production design, traceability, technical signoff or signatory exist. This document cannot be signed or shipped as a declaration.
Authorized signatory: __________________ Date: __________________
Release dependency: complete regulatory classification, exact module approvals/integration conditions, final schematics/BOM/layout/manual, risk mitigations and accredited testing where required.