Eseguo il routing mantenendo tutte le posizioni, rotazioni, layer dei componenti e il bordo esattamente invariati. Il GND non verrà collegato né tramite piano né tramite piste; instraderò solo le connessioni non-GND e verificherò il risultato.
Worked for 5 mins 12 sec
39 days ago
Thought for 11 sec — Executing routing tasks
Referenced guidance.
Thought for 13 sec
Completed 4 design checks — found 46 issues.
Thought for 29 sec
Thought for 6 sec — Considering execution skills
Referenced guidance.
Thought for 3 sec — Inspecting routing state
Checking routing progress.
Completed 4 design checks — found 46 issues.
Thought for 5 sec
Board check: 6 issue(s) found
Reading layout details.
Thought for a moment — Identifying current WS component