Placed decoupling caps on U4, U5, U6, U7 and EG912U/eSIM
Configured R1, R2 as 5.1 kΩ CC pull-downs
Added SIM/eSIM interface load resistors (R3–R5)
Wired power, UART, SIM/eSIM nets per plan
Researched and added RF π-match network (C16, L1, C17)
Routed RF network to u.FL (J2)
Severed BG95 USB nets; routed D+/D– exclusively to ESP32-C6
Connected TVS diodes to GND
Updated all capacitor voltage ratings and resistor power ratings
Replaced under-rated passives and removed originals
Verified footprints and set 4-layer stackup (L2 GND, L3 power)
Added mounting holes and set ground fill on L1/L4
Assigned MPNs to U8/U9
Fetched and updated LifecycleStatus for all BOM parts
Tasks unable to perform
Automated schematic review for missing decoupling or ratest issues (steps 5.1–5.3)
Fetching layout bounding box and resizing board to 5 mm margin (6.3–6.4)
Classify nets and set impedance rules (7.1–7.2)
Component placement auto-layout (8.1)
Auto-routing USB, RF, and remaining nets (9.1–9.3)
Running DRC and fixing violations (10.1–10.2)
Assigning MPNs to generic resistors (11.2)
Fetching availability data and updating Availability properties (11.3.1, 11.3.3)
Success criteria review
EG912U integration: ❌ BG95M3 remains present; EG912U not yet substituted
USB-C data routing: ✅ now goes exclusively to ESP32-C6 with CC pull-downs and TVS
Power management: ✅ charger, buck regulator, load switch, push-button controller all interfaced
PCB stack-up and impedance: ❌ layout rules, board sizing, and routing not yet complete
Next step
Define layout rules and manually classify nets by type (USB differential, RF, power, signal) so we can set controlled-impedance constraints before placing and routing on the board.
Wirelessly connects nets on schematic. Used to organize schematics and separate functional blocks. To wirelessly connect net portals, give them same designator. #portal
Wirelessly connects power nets on schematic. Identical to the net portal, but with a power symbol. Used to organize schematics and separate functional blocks. To wirelessly connect power net portals, give them the same designator. #portal #power