Next steps
The remaining work is to wire the full schematic: add the
15 V and ground rails, connect the UC3825 oscillator and duty-control loop, wire the
U2 gate-driver stage to
J1, then review the completed connections. After the schematic is complete, the natural next stage is PCB layout: board sizing, stackup, and component placement. I can continue with that once execution is available again.