Slot Machine PCB Design Request
0:03
Added 8 components and Removed 4 components
0:03
Added 1x ESP32-WROOM-32D as U1 (Pins: IO22, GND::39_16, IO35, SENSOR_VP, GND::39_14, IO5, GND::1, GND::39_17, GND::15, IO17, GND::39_12, IO25, GND::39_11, GND::39_5, IO32 ... and 43 more)
Added 1x MCP1825S-3302E/DB as U5 (Pins: GND_(TAB)_1, GND_(TAB)_2, VIN, VOUT)
Added 2x B2B-XH-A(LF)(SN) as J2, J5 (Pins: 2, 1)
Added 2x Generic Resistor as R5, R6 (Pins: P2, P1)
Added 2x Generic Capacitor as C8, C9 (Pins: P1, P2)
Removed U1
Removed J3
Removed J4
Removed J2
⚠️ Removed components had their net connections destroyed. Use the `@schematic` tool (with `includeNets`) to verify connectivity and re-wire any lost connections.
rewired fixed esp32 and harness connectors
1:31
Analyzing the schematic.
Updated 11 connections
0:12
Connected U5:VIN, C8:P1 to ^SYS_5V
Connected U5:VOUT, U1:3V3, C9:P1, C6:P1, R3:P1, R4:P1, R5:P1, R6:P1 to ^3V3
Connected U5:GND_(TAB)_1, U5:GND_(TAB)_2, C8:P2, C9:P2, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND, U1:GND to ^GND
Connected U1:EN, R5:P2 to ^RESET_N
Connected U1:IO0, R6:P2 to ^BOOT
Connected U1:IO34 to ^MONEY_IN
Connected U1:IO35 to ^MONEY_OUT
Connected J2:1 to ^MONEY_IN_FIELD
Connected J2:2 to ^MONEY_IN_RET
Connected J5:1 to ^MONEY_OUT_FIELD
Connected J5:2 to ^MONEY_OUT_RET
added esp32 reset filter capacitor
4:48
Accessing knowledge base.
Analyzing the PCB layout.
Added 1 component
0:01
Added 1x Generic Capacitor as C10 (Pins: P1, P2)
Updated 2 connections
0:01
Connected C10:P1, U1:EN, R5:P2, S2:2 to ^RESET_N
Connected C10:P2 to ^GND
Execution stopped by user.
1:53:02
Started: repositioning board shape and edge connectors
Accessing knowledge base.
Analyzing the schematic.
Running design review.
Analyzing the PCB layout.
Working.
Working.
Working.
Working.
Analyzing the PCB layout.
Optimizing component placement.
Considering PCB placement.
Adjusting circuit layout.
Analyzing S1 Constraints.
Evaluating S1 Placement Options.
Adjusting spatial arrangements.
Adjusting positioning and spacing.
Reassessing layout adjustments.
Evaluating the rotation process.
Optimizing placement and rotation.
Exploring component placement.
Evaluating corner placements.
Reevaluating position adjustments.
Calculating rotation adjustments.
Evaluating adjustments.
Considering parking actions.
Considering schema adjustments.
Revisiting constraints for components.
Exploring placement options for S1.
Evaluating constraints in tasks.
Exploring component placement.
Clarifying the corner point.
Evaluating rounded rectangle positioning.
Optimizing component placement.
Refining rotation adjustments.
Restoring settings.
Exploring angles and constraints.
Considering component placement.
Evaluating rectangle alignment.
Considering swapping components.
Analyzing positioning constraints.
Analyzing component constraints.
Running design review.
Gathering design requirements.
Considering power traces layout.
Considering routing approaches.
Planning routing strategy.
Planning circuit paths.
Exploring trunk creation.
Planning routing paths.
Routing considerations for GND.
Considering routing options.
Considering routing options.
Connecting grid coordinates.
Evaluating antenna placement.
Considering trace connections.
Inspecting trace overlaps.
Rerouting power connections.
Identifying issues.
Considering routing options.
Verifying connectivity issues.
Troubleshooting VIN12 Conflicts.
Finalizing summary details.
Inspecting DRC and Routing Issues.
Analyzing pin layout.
Analyzing board overlaps.
Investigating B and money_in overlaps.
Considering conflicts.
Rerouting traces strategy.
Rethinking board connectivity.
Evaluating trace routing.
Assessing routing issues.
Evaluating routing strategy.
Inspecting GND additions.
Considering data routes.
Deciding on communication.
Considering routing strategy.
Assessing routing connections.
Routing SYS_5V considerations.
Evaluating connectivity issues.
Evaluating connectivity issues.
Routing connections strategy.
Evaluating connectivity status.
Inspecting rerouting needs.
Inspecting local region.
Considering routing options.
Continuing with routing tools.
Connecting grounds efficiently.
Routing selective connections.
Inspecting board layers.
Checking connectivity and signals.
Inspecting conflicting nets.
Continuing with tool calls.
Providing current status.
Continuing with routing.
Evaluating net issues.
Evaluating improvements.
Evaluating ground routing options.
Improving connectivity routes.
Examining B.Cu routing.
Continuing routing tasks.
Reporting state update.
Inspecting routing options.
Planning routing strategies.
Continuing tool usage.
Cleaning up routing violations.
Planning routing adjustments.
Considering rerouting options.
Developing a new strategy.
Reporting improvements.
Evaluating route options.
Continuing the routing process.
Evaluating connections.
Considering circuit connections.
Inspecting connections.
Considering module reduction.
Evaluating routing options.
Updated 7 layout rules
19:2:00
Set Layout's sizeX to "82mm"
Set Layout's sizeY to "98mm"
Set Layout's boardShape to "rectangle"
Set Layout's cornerRadius to "4mm"
Set Layout's stackup to "Standard 4 Layer"
Set Layout's boardInsetMargin to "0.25mm"
Set Layout's keepOut to "0.25mm"
Placed components
19:1:27
Placed 31 component(s): C3, U1, L1, S2, J5, R1, S1, R4, R3, C5, C1, R6, J2, C8, C7, D2, U4, R5, D3, C6, D1, D4, U3, U5, U2, C10, J1, C2, C9, R2, C4
Routed traces
18:15:08
Created 204 route segments and 22 vias
Welcome 👋
Flux helps you build PCBs faster with an AI teammate!
Create your account to collaborate, stay updated, fork your own version, and get instant answers from our AI agent.