Designing PeakNode 1 Specifications


Work done
  • Confirmed and preserved the 90 mm × 60 mm board and 4-layer Signal / GND / Power / Signal stackup.
  • Reapplied baseline routing constraints for 5 mil signal, 20 mil power, 40 mil battery/charge, 0.3 mm drill, and rounded/non-90-degree trace guidance.
  • Ran routing-prep neckdown generation; kept successful neckdowns, attempted two remediation passes, and skipped the unfixable 3V3 neckdowns for U1 / IC1 / U3 so routing can proceed with normal traces there.
  • Improved placement for routeability: preserved GNSS top-left, LoRa/SMA top-right, LTE/SMA bottom-right, MCU center, and power/USB bottom-edge regions; also corrected lower-edge components back inside the board and cleared placement overlaps.
  • Re-ran checks after the routing-prep pass; the latest verified blocker state before the final placement cleanup was 6 overlapping-copper reports and 44 airwires, down from 13 overlapping-copper reports and 44 airwires at the start.
Success criteria review
  • ✅ Board size and 4-layer stackup were preserved.
  • ✅ RF/GNSS/SMA floorplan intent was preserved during cleanup.
  • ✅ Manufacturing/routing rules were reinforced as layout constraints.
  • ⚠️ Placement was improved for routeability, but final verification after the last placement cleanup could not be completed in this session.
  • ❌ Full routed-board success criteria are not met yet because there is no available board-routing action in this run to route power, RF, MCU/control, and low-speed nets in sequence.
Next steps
Proceed to the PCB routing pass in the PCB editor/autorouter: route VBUS/VBAT/3V3 first, RF paths second with no vias and 45-degree/curved bends, SPI/control buses third with length matching, then audio/UI/low-speed nets. After routing, re-run checks for airwires, copper overlaps, RF keepout infringement, power-width mismatches, and decoupling placement.

Started implementing a plan

Create an updated brief to execute the PeakNode 1 PCB routing pass on a 90×60mm 4-layer board (Top Signal / L2 GND solid / L3 3V3 Power plane / Bottom Signal), preserving RF/GNSS keepouts and SMA placements, and then run DRC to flag airwires, copper overlaps, RF keepout violations, power width violations, and missing decoupling.

What has been done so far

- Confirmed board setup: 90mm × 60mm rectangle and 4-layer stackup with L2 as Ground Plane and L3 as Power Plane.

- Applied baseline global layout rules: min trace width 0.127mm (5 mil), preferred widths 0.127mm/0.508mm/1.016mm (5/20/40 mil), hole size 0.3mm, via options noted (0.3/0.6 and 0.2/0.4 for fanout), minimum corner radius 0.25mm.

- Neckdown polygon generation attempted; persistent 3V3 neckdown collisions for U1/IC1/U3 were remediated by skipping those neckdowns after multiple attempts.

- Placement refined to preserve the intended floorplan zones (GNSS top-left, LoRa+SMA top-right, LTE+SMA bottom-right, MCU center, power+USB bottom-left/bottom edge) while reducing overlaps and improving routing channels; all components are now within the board outline.

- Latest DRC status still shows unresolved errors: overlapping copper remains (pads 68ec3f7c and b229b54f) and 44 unrouted connections (airwires).

Implementation plan

1. Re-run DRC to get current, precise overlap and airwire locations (do not rely on cached results) and identify which components/nets correspond to pads 68ec3f7c and b229b54f.

2. Clear remaining overlapping-copper errors by re-routing or adjusting local copper around the specific offending pads/nets (do not change board size or move RF connectors). Re-validate overlapping copper until zero.

3. Route power nets first (VBUS, VBAT/battery+charge path, 3V3) using width rules: 40 mil for battery/charge path, 20 mil for power distribution; prioritize short/wide paths in the power section and adequate via stitching for thermal/current return.

4. Route RF-critical traces second:

- Route LoRa RF from SX1262 matching network to LoRa SMA with no vias, no 90° bends, and maintain the CPWG geometry target; keep copper pours cleared under/around the RF feed as required.

- Route LTE RF to LTE SMA similarly with no vias and smooth bends.

- Add GND stitching via fences around RF keep-out regions at ~5mm pitch.

5. Route MCU-to-radio/control buses third:

- Route SX1262 SPI (SCK/MOSI/MISO/NSS) and control lines (BUSY/DIO1/NRESET) and ensure SPI length matching within 2mm.

- Route USB D+/D- from MCU to modem/USB-C as applicable with tight coupling and minimal stubs.

6. Route remaining audio, UI, and low-speed nets last, maintaining audio/RF isolation; ensure the NAU8810 analog ground island connection strategy is preserved.

7. Re-run full DRC and flag (and fix if possible): unconnected nets/airwires, RF keep-out violations, power trace width violations, and any new copper overlaps.

8. Run a decoupling audit: verify each IC has 100nF + 10uF where required and that caps are placed within 0.5mm of the associated power pins on the same layer; list any missing/too-far decouplers for manual correction.

Task completed.

1:00

Thought for 6 sec — Retrieving skills information
Looking up PeakNode 1 PCB routing pass RF GNSS keepouts DRC d....
Created the updated routing execution brief for PeakNode 1 and saved it as PeakNode 1 PCB Routing Pass Brief. It captures the 90×60 mm 4-layer stackup, current DRC state, routing order, RF/GNSS/SMA preservation requirements, DRC checklist, and decoupling audit criteria.
After routing, re-run checks for airwires, copper overlaps, RF keepout infringement, power-width mismatches, and decoupling placement
I re-ran the checks: the board is not clean yet — current results show 32 airwire errors, 6 overlapping-copper errors, 1 floating-copper error, and 21 dangling-trace warnings. No specific RF-keepout or power-width violation was returned by the checked DRC set, and no decoupling error/warning was returned, but the 0.5 mm same-layer decoupling requirement still needs physical placement inspection; details are saved in Post-Routing DRC Checks.
Fix routing errors
Locate airwires
Check decoupling placement
Check power widths
Document fixes

PeakNode 1 PCB Routing Pass Brief
Objective
Execute the PeakNode 1 PCB routing pass on the existing 90 mm × 60 mm 4-layer board while preserving RF/GNSS keepouts and SMA connector placements. After routing, run DRC/review checks and report all remaining airwires, copper overlaps, RF keepout violations, power-width violations, and decoupling placement gaps.
Board and Stackup Requirements
  • Board outline: 90 mm × 60 mm rectangle.
  • Stackup:
    • Layer 1: Top Signal
    • Layer 2: Solid GND plane
    • Layer 3: 3V3 Power plane
    • Layer 4: Bottom Signal
  • Do not resize the board.
  • Do not move RF connectors/SMA placements unless required to fix a manufacturing blocker and explicitly documented.
  • Preserve GNSS and RF keepout zones.
Current Known State
  • Board setup has already been confirmed as 90 mm × 60 mm with a 4-layer stackup.
  • L2 is assigned as Ground Plane.
  • L3 is assigned as Power Plane.
  • Baseline global layout rules have already been applied:
    • Minimum trace width: 0.127 mm / 5 mil.
    • Preferred widths: 0.127 mm / 0.508 mm / 1.016 mm for signal / power / battery-charge classes.
    • Default via hole size: 0.3 mm.
    • Via options noted: 0.3 / 0.6 mm standard and 0.2 / 0.4 mm for fanout.
    • Minimum trace corner radius: 0.25 mm.
  • Neckdown polygon generation was attempted.
  • Persistent 3V3 neckdown collisions for U1 / IC1 / U3 were remediated by skipping those specific neckdowns after multiple attempts.
  • Placement has been refined to preserve the floorplan:
    • GNSS: top-left.
    • LoRa + SMA: top-right.
    • LTE + SMA: bottom-right.
    • MCU: center.
    • Power + USB: bottom-left / bottom edge.
  • All components are currently within the board outline.
  • Latest known unresolved DRC status:
    • Overlapping copper remains around pads 68ec3f7c and b229b54f.
    • 44 unrouted connections / airwires remain.
Execution Sequence
1. Fresh DRC Snapshot
Re-run current DRC/review checks before making changes. Do not rely on cached results.
Required checks:
  • Airwires / unrouted connections.
  • Overlapping copper.
  • Dangling traces.
  • Floating copper.
  • Invalid layers.
  • Protected/keepout intrusions where available.
  • Missing footprints.
  • Under-connected vias.
Record:
  • Current airwire count and affected nets/components.
  • Current overlapping-copper count and exact pads/nets/components, especially pads 68ec3f7c and b229b54f.
  • Whether any stale/dangling traces exist before routing.
2. Clear Copper Overlaps First
Fix manufacturing-blocking copper overlaps before attempting to route airwires.
Constraints:
  • Do not change board size.
  • Do not move RF connectors/SMA placements.
  • Preserve RF/GNSS zones and keepouts.
  • Prefer local routing/copper adjustment or moving small passives over moving major ICs/modules.
Validation gate:
  • Re-run overlapping-copper DRC until overlapping copper is zero, or list each remaining overlap with blocker reason.
3. Pre-Routing Cleanup
Before routing:
  • Check for dangling traces.
  • Remove/clean stale dangling routing if present.
  • Confirm stackup is still 4-layer with L2 GND and L3 Power.
  • Confirm all components remain inside the 90 mm × 60 mm outline.
4. Route Power Nets First
Route power and high-current paths before signals.
Priority nets:
  • VBUS.
  • VBAT / battery path.
  • Charger path.
  • 3V3 distribution.
  • 1V8 distribution if still unrouted.
Width targets:
  • Battery / charge path: 1.016 mm / 40 mil.
  • Main power distribution: 0.508 mm / 20 mil.
  • Signal minimum: 0.127 mm / 5 mil.
Power routing requirements:
  • Keep power paths short and wide in the bottom-left power/USB section.
  • Use multiple vias where power transitions layers.
  • Preserve L2 as a continuous GND return plane.
  • Preserve L3 as the 3V3 plane.
  • Add/maintain thermal/current return via stitching around charger/regulator thermal pads and inductor ground-return regions.
5. Route RF-Critical Traces Second
Route RF paths after power, before digital/control buses.
LoRa RF requirements:
  • Route SX1262 / matching network to LoRa SMA.
  • No vias in the RF feed path.
  • No 90-degree bends; use 45-degree or smooth bends.
  • Maintain intended CPWG geometry target where possible.
  • Keep copper pours cleared under and around the RF feed as required.
  • Preserve LoRa SMA placement and top-right RF floorplan.
LTE RF requirements:
  • Route LTE modem RF path to LTE SMA.
  • No vias in the RF feed path.
  • No 90-degree bends; use 45-degree or smooth bends.
  • Preserve LTE SMA placement and bottom-right floorplan.
RF keepout/stitching requirements:
  • Preserve RF and GNSS keepouts.
  • Add/maintain GND stitching via fences around RF keepout regions at approximately 5 mm pitch where supported.
  • Do not allow copper under GNSS antenna keepout regions on any layer.
6. Route MCU-to-Radio and Control Buses Third
Route buses and critical digital control after power/RF.
SX1262 interface:
  • SPI: SCK, MOSI, MISO, NSS.
  • Control: BUSY, DIO1 IRQ, NRESET.
  • Keep SPI length matching within 2 mm where practical.
  • Route against the continuous L2 GND reference.
USB/interface routing:
  • Route USB D+ / D− from MCU to modem/USB-C as applicable.
  • Keep D+ / D− tightly coupled, similar length, and with minimal stubs.
  • Avoid crossing plane discontinuities.
7. Route Remaining Low-Speed Nets Last
Route remaining non-critical nets after power, RF, and radio/control buses.
Include:
  • Audio codec / mic / speaker amp signals.
  • UI buttons.
  • RGB LED channels.
  • UARTs, GPIOs, status lines, reset lines, and remaining low-speed control.
Audio/RF isolation:
  • Maintain separation between audio and RF sections.
  • Preserve NAU8810 analog-ground strategy: analog ground island tied to digital ground at a single controlled point under/near NAU8810 where the design implements this topology.
8. Final DRC / Review Pass
After routing, run a full DRC/review pass.
Flag and fix where possible:
  • Airwires / unrouted nets.
  • Overlapping copper.
  • Floating copper.
  • Dangling traces.
  • Invalid layer assignments.
  • Protected/keepout intrusions.
  • RF keepout violations.
  • Power trace width violations.
  • Under-connected vias.
  • Missing footprints.
Final report must include:
  • Remaining airwire count and list of affected nets/components.
  • Remaining copper overlap count and affected geometry/components.
  • RF/GNSS keepout status.
  • Power-width compliance status for VBUS, VBAT/charge, 3V3, and 1V8.
  • Any issues that require manual RF tuning or manual PCB editor intervention.
9. Decoupling Audit
Verify decoupling after routing/placement.
Audit requirement:
  • Every IC power pin should have local 100 nF decoupling where required.
  • Each IC power domain should have appropriate local/bulk 10 uF capacitance where required.
  • Decoupling capacitors should be on the same layer as the IC where practical.
  • Target placement distance: within 0.5 mm of the associated IC power pin when feasible.
Report:
  • Missing 100 nF capacitors.
  • Missing 10 uF bulk/local capacitors.
  • Capacitors placed farther than 0.5 mm from their associated power pins.
  • Any caps that require manual relocation.
Success Criteria
  • Board remains 90 mm × 60 mm.
  • Stackup remains Top Signal / L2 GND / L3 3V3 Power / Bottom Signal.
  • RF/GNSS keepouts and SMA placements are preserved.
  • Overlapping copper is reduced to zero, or every remaining overlap is explicitly documented with a blocker reason.
  • Airwires are reduced as far as possible, with all remaining unrouted nets listed.
  • Power routing follows 40 mil battery/charge and 20 mil power distribution targets.
  • RF paths avoid vias and 90-degree bends.
  • SPI to SX1262 is length-matched within 2 mm where practical.
  • DRC/review results are refreshed after the routing pass.
  • Missing or poorly placed decoupling is documented for correction.
Notes for Execution
  • Follow the DRC fix priority: missing footprints, invalid layers, overlapping copper, clearance/protected intrusions, dangling traces, floating copper, airwires, then ERC-quality issues.
  • Do not route before clearing manufacturing-blocking overlaps and dangling traces.
  • If routing remains blocked, diagnose whether the cause is congestion, local overlap, keepout restriction, or unroutable fanout, then move only the smallest non-critical component necessary while preserving RF connector positions.
  • Objective

  • Board and Stackup Requirements

  • Current Known State

  • Execution Sequence

  • 1. Fresh DRC Snapshot

  • 2. Clear Copper Overlaps First

  • 3. Pre-Routing Cleanup

  • 4. Route Power Nets First

  • 5. Route RF-Critical Traces Second

  • 6. Route MCU-to-Radio and Control Buses Third

  • 7. Route Remaining Low-Speed Nets Last

  • 8. Final DRC / Review Pass

  • 9. Decoupling Audit

  • Success Criteria