Power Circuit Design

Objective
Report-only verification that the Bottom GND polygon exists and behaves correctly. Do not modify the design.
Scope (STRICT, NO EDITS)
  • Do NOT create, move, or edit any object.
  • Do NOT start routing or place polygons/zones.
  • REPORT ONLY.
Tasks
  1. Polygons inventory
    • List all polygons/fills with: • Layer • Net • Approx. area (if available)
    • Confirm there is at least one polygon on Bottom layer tied to GND.
  2. Connectivity spot-check (report-only)
    • For these GND pads, report whether they have thermal/solid connections to the Bottom GND polygon: • J24V_IN:GND • D1 (TVS):GND • U1 (buck): GND pad • U2 (3.3 V LDO): GND/EP • J_SDCARD: shield GND
    • If thermal spokes cannot be programmatically detected, state “unable to auto-detect” and just report whether the GND polygon touches those pads.
  3. Targeted DRC (categories only; no edits)
    • Run/check these categories and summarize counts: • Floating/Isolated copper (islands) • Overlapping fills / polygon overlaps • Protected intrusions (keep-out violations) • Clearance violations (global)
    • If any violations remain, list each with: • Category • Object(s) • Coordinates or reference • One-line hint on what to adjust manually
  4. Crystal keep-out confirmation
    • Report if any keep-out rules/zones are present around the crystal loop (Y1, C15, C16).
    • If present, confirm the Bottom GND polygon is not filling inside that keep-out.
  5. Suggested GND stitching via spots (TEXT-ONLY)
    • Suggest 3–6 coordinates or reference-near spots where stitching vias would most help (buck GND loop, TVS/J24V_IN GND, LDO GND/EP, SD shield corners).
    • Do not place vias; suggestions only.
Output format
Return a concise checklist:
  • Polygons found (layer/net/area)
  • GND polygon on Bottom: YES/NO
  • GND contact at key pads: per pad YES/NO (or “undetected”)
  • DRC summary: counts per category + short list of remaining items
  • Crystal keep-out: present YES/NO; fill inside keep-out YES/NO
  • Suggested stitching via spots: bullet list (text-only)
Important
This is a verification pass. DO NOT queue actions or start long plans. If any step is unsupported by the API, say so and continue with the rest.
179 days

1:22

179 days

To get started, talk to Flux or create a New Document.

Documents

    Documents are markdown text files which describe project goals, capture details, or even simulation outputs.

    Assets

    Assets are files uploaded to this project which can be used in various ways.

    pcb making thumbnail
    Nextion HMI & Thermal Printer UART Integration with Enhanced microSD SPI Interface, ESD Protection, and LP3982-Regulated 3.3V Power Rail

    Properties

    Pricing & Availability

    Distributor

    Qty 1

    Arrow

    $19.73–$20.21

    Digi-Key

    $20.43

    LCSC

    $22.54

    Mouser

    $6.70

    TME

    $24.32

    Verical

    $26.54–$33.20

    Controls