I prepared the continuation plan and design brief, but execution was blocked because the account currently reports no available ACUs despite the recent payment. No schematic changes were made in this session.
Remaining work: inspect and wire the existing 89 components into four rectifier/capture channels, protected common DC bus, latched hardware shutdown, then run ERC/connectivity verification. If the purchase should already be active, refresh Flux and check the plan/usage status; for account-credit issues contact
Flux support and include the run ID.