Final manufacturing checklist passed for REV A: no open DRC/ERC issues in the checked categories, connector/pinout/power mapping verified, and I added the 5V NC / DO NOT USE silkscreen warning. The only caveat is BOM-only: the 22 bare copper test pads have no MPN, which is expected unless you want assembled test-point hardware.