Final manufacturing checklist passed for REV A: no open DRC/ERC issues in the checked categories, connector/pinout/power mapping verified, and I added the 5V NC / DO NOT USE silkscreen warning. The only caveat is BOM-only: the 22 bare copper test pads have no MPN, which is expected unless you want assembled test-point hardware.
Your and are available in the table tabs. Ask Flux to draw the schematic, or draw it yourself.
REV A Manufacturing Checklist
Status
Final checklist review completed on 2026-07-04 for the routed RP2040-Zero Controller Carrier REV A.
DRC / ERC Gate
Checked categories returned no open errors or warnings as of 2026-07-04T08:01:11.049Z:
Airwires / unrouted nets: PASS
Shorts / shorted components: PASS
Floating copper: PASS
Overlapping copper / traces: PASS
Missing footprints: PASS
Invalid layers: PASS
Dangling traces: PASS
Relevant ERC warnings: PASS
Manufacturing caveat: the manufacturer-part-number check reports the 22 PCB test pads as missing MPNs. These are bare PCB copper/drill test pads, not assembled purchasable parts, so this is a BOM/assembly caveat rather than an electrical/layout blocker.
Board / Layout
Board: 80 mm x 50 mm, Standard 2-layer stackup.
U1 RP2040-Zero: near bottom edge; USB-C side remains physically accessible.
JLEFT: left edge at approximately X=-37.05 mm, Y=0 mm.
JRIGHT: right edge at approximately X=37.05 mm, Y=0 mm.
Mounting holes H1-H4: M2 mechanical holes at the four corners.
5V remains intentionally no-connect and is not used as a board power path.
3V3 is not shorted to GND per shorted-components ERC/DRC gate.
3V3 connects only to U1:3V3, JLEFT pin 2, JRIGHT pin 2, and TP_3V3.
GND is common across U1, JLEFT pins 1/13, JRIGHT pins 1/13, and TP_GND.
Export Notes
Generate Gerber ZIP, BOM, pick/place CPL, PDF documentation, and any available additional mechanical/electrical export files from this approved routed revision. Before ordering, visually inspect generated Gerbers and verify pick/place rotations with the assembly vendor.