Layout placement is complete on a compact 60 × 50 mm, 4-layer board. I spread the resistors/passives, moved the USB-C connector clear of the programming header, swapped the charger to the cleaner BQ24074RGTT footprint, and the placement-focused review now shows no remaining placement/footprint/overlap errors.
I stopped before routing as planned; next step is trace routing once you approve this placement.
I’ll route only the USB and power nets now, keeping the existing placement intact. I’ll confirm the 4-layer stackup, set appropriate width/clearance rules for USB 2.0 and power rails, clean any stale dangling traces, route, then run DRC on the routed nets.
The routing pass hit the platform timeout after the stackup/rules were applied. I’m checking whether any routes were committed, then I’ll either validate them or report the routing blockage cleanly.
I set the board to a 4-layer stackup with inner GND and power planes, added wider minimum trace rules for USB/power nets, and confirmed there were no dangling traces before routing.
The routing job timed out and did not commit usable routes; review still shows 91 airwires. The blocker appears to be platform routing timeout/board routing complexity, not missing stackup or rules.