Add four center-negative barrel output connectors with overcurrent and reverse-polarity protection.
Complete net connections and run ERC.
Prepare PCB layout: verify footprints, set 1590B/1590BB outline, configure stackup, place mounting holes.
Define layout rules, place components, and route nets.
Perform DRC and manufacturability review.
Success Criteria Review
Regulated 9 V @ 1 A output: not yet implemented
Four protected barrel outputs: not yet added
Main switch, LED indicators, enclosure fit: pending
Recommended Next Step
Add the remaining active components (USB-C connector, barrel jack, power switch, and LEDs) to the schematic to complete the power-path architecture before moving on to passives and connectivity.