Project Start Prompt


The mechanical placement repair is still running; it is rebuilding the 220-part board against actual footprint geometry rather than accepting the earlier invalid placement. The completion gate remains zero overlaps, zero out-of-bounds parts, and verified CMC/USB access.
Received notification from "PCB Placement Repair" that it finished — picking the work back up.
The project files were updated successfully:
  • Saved the ECU PCB Layout Checklist, including the four proposed 3.2 mm M3 holes and 8 mm keepouts.
  • Updated the architecture and connector notes for the external GM-style 40–304 kPa MAP sensor.
  • Recorded MAP wiring as A = SENSOR_GND, B = MAP_IN, C = SENSOR_5V.
  • Removed onboard MAP sensor, hose-barb, and pressure-port requirements from the documentation.
The placement executor completed, but I could not retrieve and independently reconcile its final report before tool access ended. The last verified pre-repair state had many components outside the 180 × 120 mm outline and 375 unrouted connections, so the repaired placement is not yet approved for routing.
Remaining work:
  • Verify the MAP reservation graphics were actually removed.
  • Confirm all four mounting holes exist at the specified coordinates.
  • Check overlaps, board bounds, mounting-hole keepouts, CMC access, Teensy USB access, and analog isolation.
  • Resolve schematic/ERC issues before routing.
  • Route and run final DRC, thermal, transient, and manufacturability reviews.
Execution stopped because your ACUs ran out.
Verify repaired placement
Check mounting holes
Review schematic issues
Validate MAP cleanup

FKNRUN

FKNRUN thumbnail