Top Side PCB Layout


Thought for 3 mins 11 sec
Thought for 5 sec
Searching tasks in /ryanf/solar-usb-c-1s-power-manager-test-testroledecoupling-7ef8~9fx…
Thought for 7 sec — Evaluating review process
2/4 Independently review placement constraints and power-stage geometry

Place all 110 components on the top side within the confirmed 50 × 60 mm outline

Independently review placement constraints and power-stage geometry

Correct unauthorized L6 substitution and resolve blocking U2 placement findings

Verify top-side-only placement, bounds, overlaps, keepouts, and DRC

Thought for 10 sec
Awaiting 1 task
"PCB Placement Review" completed.
Thought for 23 mins 46 sec
Thought for 7 sec
Managing 1 task
Thought for 12 sec — Fixing issues in the builder
3/4 Correct unauthorized L6 substitution and resolve blocking U2 placement findings

Place all 110 components on the top side within the confirmed 50 × 60 mm outline

Independently review placement constraints and power-stage geometry

Correct unauthorized L6 substitution and resolve blocking U2 placement findings

Verify top-side-only placement, bounds, overlaps, keepouts, and DRC

Thought for 11 sec
Thought for 8 sec
Awaiting 1 task
"PCB Placement Validation" completed.
Placed all 110 components on the Top side of the 50 × 60 mm board. Verification shows zero overlaps, keepout/boundary violations, pad-access errors, or required power-stage errors; L6 was restored to the original Coilcraft XAL3225-102ME.
Open items
  • 10 non-blocking switching-stage advisories remain, mainly capacitor-bank alignment and minor routing detours.
Suggested next steps
  1. Clean up the remaining placement advisories.
  2. Route the power stages and board.
  3. Run final DRC and silkscreen cleanup.