PCB Auto-Layout


I couldn’t analyze or run auto-layout because no ACUs are currently available, so I made no PCB changes. Once ACUs are available, the remaining work is to inspect placement and routing, run the required placement and/or routing pass, apply it, then verify DRC and remaining airwires.
No PCB changes were made. Auto-layout analysis and execution remain blocked because the account has no available ACUs; once restored, the board needs inspection to determine whether placement, routing, or both are required, followed by auto-layout and DRC/airwire verification.
No changes have been applied. The PCB analysis and auto-layout remain blocked because the account has no available ACUs; after ACUs are restored, I can inspect the board, run placement and/or routing as needed, apply the result, and verify DRC and remaining airwires.
Inspect layout status
Check DRC status
Review critical placement

Waiting for input