I’ll create a structured takeover report covering both boards, architecture, completed work, current live state, known blockers, recovery history, verification gates, and the exact order a new engineer should follow.
Power, camera, radar, autopilot, Wi‑Fi, FHSS and SIYI interfaces
Board dimensions, stackups and enclosure direction
Completed fixes and verified checks
Routing-service failure and recovery history
Known footprints, software and regulatory risks
Recommended takeover sequence
Fabrication-release gates
Immediate first-day checklist and required engineer deliverables
The report clearly marks both boards HOLD for fabrication until routing, interface freeze, DRC, thermal, software and mechanical validation are complete.