Project Start


Thought for 9 mins 32 sec
1/5 Inspect the current schematic and reconcile the partial wiring state

Inspect the current schematic and reconcile the partial wiring state

Correct AP63203 and complete USB/host-side power and RT1024 support circuitry

Complete isolated power, I2C/control, and digital-audio barrier wiring

Complete dual-clock, SRC4392, and AES3 input/output wiring

Run ERC, fix actionable findings, and verify the completed schematic

Accessed knowledge for the next task.
Thought for 7 sec
Referenced guidance.
Thought for 25 sec
Created a thread
AES3 USB Schematic
Needs input
View Thread
Thought for 11 sec
Awaiting 1 background task
Received notification from "AES3 USB Schematic" that it finished — picking the work back up.
The schematic executor completed, but I can’t inspect/reconcile its report or run the independent ERC verification because no ACUs are currently available.
Current state:
  • The full-schematic completion task was dispatched with the fixed isolation, dual-clock, power, MCU, SRC4392, and AES3 requirements.
  • The executor reports completed, so its changes should now be present in the project.
  • Still required: independently inspect the committed wiring, review remaining ERC findings, verify no accidental isolation-barrier connection exists, and confirm clock/I2S timing and AES3 termination before proceeding to PCB layout.
Inspect schematic changes
Verify isolation barrier
Check clocks and I2S
Review AES3 termination