I’ll fix the 5V airwire by first re-running the relevant routing/DRC checks, cleaning any stale dangling trace if present, then routing the missing 5V connection and verifying the Airwires review is clear.
Routing couldn’t start because the project already has an auto-layout/routing job marked active/converged. I’m checking whether that job’s result already cleared the airwires before deciding whether user action is needed.
I verified the current DRC: there are still 16 airwire errors, including the 5V/C1 issue, and no dangling-trace cleanup was available to perform first.
I tried to start routing, but the project is blocked by an existing active/converged auto-layout job. Please discard or apply/finish that existing job in the UI, then I can rerun routing and verify the airwires clear.
Documents are markdown text files which describe project goals, capture details, or even simulation outputs.
Assets
No assets added.
5-LED WS2812B 3535 Row
Five WS2812B-3535-style addressable RGB LEDs in a daisy-chain row with per-LED 100nF decoupling, a 330Ω data input resistor, and external 5V/GND/DATA pads.
Properties
Properties describe core aspects of the project.
Pricing & Availability
Distributor
Qty 1
LCSC
$0.15
Controls
Welcome 👋
Flux helps you build PCBs faster with an AI teammate!
Create your account to collaborate, stay updated, fork your own version, and get instant answers from our AI agent.