I resumed the existing PCB placement remediation and gave it the routing-readiness criteria: fresh DRC, zero unintended overlaps, pin-level decoupling placement, compact regulator loops, usable high-speed escape channels, and preservation of the fixed CM5/M.2/RF mechanics.
The placement task has now completed, but I could not retrieve or independently reconcile its final report. Therefore, the PCB is not yet approved for routing.
Remaining work:
- Inspect the completed placement changes and fresh DRC results.
- Verify decouplers and regulator hot loops at pin level.
- Confirm the repaired U15/U16/U18/U21 footprints, M.2 retention holes, differential-pair metadata, and radio-power neckdown rules remain correct.
- Run an independent pre-routing review.
- Present the placement checkpoint before generating neckdowns or routing.
Execution stopped because your ACUs ran out.