The U12 placement verification executor completed, but its final report could not be retrieved and reconciled before tool access ended.
This session:
- Reconciled the prior contradictory U12 reports.
- Confirmed the latest known live candidate was U12 at X −52.5 mm, Y 29.0 mm, Bottom, 180°.
- Launched an independent placement gate covering pad containment, antenna orientation, six-layer copper clearance, U12/JPORT1 overlap, and R11/IO17 routability.
- Kept general routing paused to avoid routing around an invalid RF-module placement.
Still unresolved until the completed report is retrieved:
- Whether every U12 pad is fully inside the board and routable.
- Whether the antenna region has valid copper clearance on all six layers.
- Whether the U12/JPORT1 overlap and R11/IO17 routing warnings are cleared.
- Power-first routing, USB verification, redundant-copper cleanup, final DRC, and the remaining ordered production checks.