The ZE07-H2 footprint-fix executor has finished, but I cannot access its report or inspect the modified footprint in this turn. Therefore, I cannot safely claim that the five-pin offset, pad numbering, routing, or DRC is correct.
The project remains at the post-footprint-edit stage. Before fabrication, it still needs:
- Reconcile the executor’s exact ZE07-H2 pad coordinates against the attached datasheet.
- Verify pins 1–5 form the correctly offset five-pin side and pins 6–15 remain correctly aligned.
- Check whether the ZE15-CO uses identical mechanical geometry.
- Re-run routing/airwire checks and full ERC/DRC.
- Regenerate Gerbers, drill files, IPC-D-356, and placement outputs.
Do not use the previously exported manufacturing package; it predates the footprint correction. Execution stopped because your ACUs ran out.