Energy Harvesting PMU Schematic

Connections to Make

Table


NetConnections
3V3_DIGITALU2:5, J2:1
GNDU2:1, U2:3, C5:2, R5:2, J2:2, J3:2
CT_SIGNAL_ACR4:1, C10:1, J3:1
Connections to Remove

Table


NetConnections
I can apply these net connections for Group 4.
perform ERC
ERC Summary for CT_Energy_Harvester_PMU
Critical Errors:
  • Overlapping Copper (51 errors): Multiple copper shapes are shorted together (e.g. GND vs HARVEST_IN, etc.).
  • Airwires (26 errors): Numerous nets (e.g. D3 net, U1:VIN to D3, etc.) have unrouted connections.
  • Layers with Multiple Fills (1 error): Conflicting copper fills on the same layer.
  • Missing Manufacturer Part Number (1 error): SUBLAYOUT1 (the LDO symbol) has no MPN assigned.
Warnings: None
Successes: Many nets correctly routed and parts have footprints.
Next Steps:
  1. Resolve copper overlaps by adjusting trace/fill shapes.
  2. Route all airwires.
  3. Assign an MPN to SUBLAYOUT1.
  4. Re-run ERC to ensure no remaining critical errors.
Let me know which issue you’d like to tackle first.
Adjust copper clearance
Add 3.3V LDO
Trace width for VIN
Add manufacturer part number
Clearance around SW node

To get started, talk to Flux or create a New Document.

Documents

    Documents are markdown text files which describe project goals, capture details, or even simulation outputs.

    Assets

    Assets are files uploaded to this project which can be used in various ways.

    Self Powered LoraWan fault detection thumbnail
    Welcome to your new project. Imagine what you can build here.

    Properties

    Properties describe core aspects of the project.

    Pricing & Availability

    Distributor

    Qty 1

    Arrow

    $3.27–$4.31

    Digi-Key

    $5.50–$8.96

    LCSC

    $1.00–$1.25

    Mouser

    $7.57–$7.77

    TME

    $2.71

    Verical

    $2.61–$4.29

    Controls