CM5 Ethernet Switch


flux

I’ll do action 4 only: check and correct the U1/U2 terminal metadata behind the remaining ERC findings, preserve all nets and placement, then rerun ERC/DRC. I’ll pause before any routing preparation.
"Power Stage Placement" completed.

flux

Action 4 remains blocked: safe correction of the placed terminal metadata could not be verified, so no design changes were made. Fresh checks still show three Missing Power errors—U1 VBUS_EN/VBAT and U2 VDD12_SW_OUT—plus the incorrect U2/L2 association; placement and copper checks remain clear, with details in ERC Metadata Remediation.
Shall I proceed with action 5’s routing-constraint review only, keeping routing and geometry changes paused until the stackup is resolved?
ok

flux

I’ll review the PCIe, RGMII, and Ethernet routing constraints only—pair definitions, impedance targets, timing/length requirements, and reference planes. I won’t change geometry or start routing while the stackup remains unresolved.
"PCB Routing Constraint Review" completed.

flux

The routing-constraint review reported completion, but I could not retrieve its findings before tool access ended, so action 5 is not yet reconciled or verified.
This session requested a read-only review; no board edits or routing were applied by me. Next is to retrieve the report, assess its PCIe/RGMII/Ethernet findings, and present the results for your approval before any further action.
Execution stopped because your ACUs ran out.

Waiting for input


Name
Section
Pin Group
Orientation
Order
Sub-symbol

CM5 Managed Ethernet Switch

CM5 Managed Ethernet Switch thumbnail