Project Start Assistance


Okay what you are waiting to continue to the design?

flux

I’m waiting on available ACUs, not another design approval. You already authorized routing all non-USB nets while leaving USB untouched.
The next step is to verify the corrected 3V3_HOST_RAW vias and connectivity, remove redundant copper if needed, then continue routing the remaining non-USB nets and run DRC. USB routing remains blocked by the reported U3 pad-coordinate inconsistency.
I made no changes this turn. Execution stopped because your ACUs ran out; if your account now shows an available balance, Flux support can investigate why execution is still blocked.
When will i have new ACUs?

flux

I can’t see your account’s ACU reset date, and the current editor screen doesn’t show it. Check your Flux account’s billing/usage page for the renewal date; if no date appears, contact Flux support to confirm when your upgraded plan’s allowance renews.
No PCB changes were made this turn. Design execution remains stopped because your ACUs ran out.
Continue to the project.

flux

Your authorization is clear: continue routing all non-USB nets, preserving placement and USB copper. The next step is to verify the previously corrected power-route vias, resolve redundant copper, then route the remaining non-USB connections and check DRC.
I could not inspect or modify the project this turn, so no new routing was applied. Execution stopped because your ACUs ran out.

Waiting for input


PCB layout of SAM4ExtensionV5

SAM4ExtensionV5

SAM4ExtensionV5 thumbnail