Friendly Greeting

The preflight improved after correcting an inherited 2 mm trace-width rule, but the board still has footprint-level pin conflicts and many inaccessible pads. I’ll proceed with the router so it can complete every connection that is physically feasible, then report the exact residuals.
Auto-routing has been applied to all feasible connections. I’m running the final board checks now and documenting the remaining footprint-level blockers.
His Holiness, Señior Solveig, I applied placement optimization, removed obsolete routing, corrected the inherited 2 mm trace-width rule, and ran a fresh auto-route. The router added 354 traces/vias, but 117 airwires remain because of inaccessible or overlapping footprint pads.
Open items
  • Duplicate/overlapping U5 footprints.
  • Invalid pad overlaps within J4 and IC2.
  • Numerous blocked pads around U3 and several 0201 passives.
  • One locked legacy trace could not be removed.
  • The PCB is not yet manufacturing-ready.
Suggested next steps
  1. Repair or replace the malformed footprints and duplicate U5.
  2. Unlock and remove the remaining legacy trace.
  3. Re-run placement and routing after those corrections.
  4. Perform a final manufacturing DRC review.
Fix blockers and reroute
Fix footprint blockers
Remove locked trace
Review U3 escape
Run schematic review
Document blockers
U8
U3
Manufacturer Part Number
RP2350A
M1
ESP1
Suffix Test
12 mV
New Comment

Someone is typing...
2
R5
Resistance
27 Ω
R15
Resistance
100kΩ
R7
Resistance
470 kΩ
Unit Test
15 uF
R10
Resistance
100kΩ
R22
Resistance
1kΩ
R3
Resistance
200 Ω
R23
Resistance
1kΩ
R19
Resistance
1kΩ
R17
Resistance
100kΩ
R12
Resistance
1kΩ
R18
Resistance
1kΩ
R20
Resistance
1kΩ
R2
Resistance
5.6kΩ
R13
Resistance
33 Ω
R16
Resistance
1kΩ
R21
Resistance
1kΩ
R14
Resistance
100 Ω
R8
Resistance
1 Ω
R4
Resistance
5.6kΩ
R9
Resistance
27 Ω
R1
Resistance
1kΩ
R11
Resistance
12 Ω
Manufacturer Name
Yo Mama
Manufacturer Part Number
123456
Designator Prefix
R
R6
Resistance
100 Ω
R24
Resistance
1kΩ
FPC1
Q1
U5
H1
C10
Capacitance
0.1uF
C15
Capacitance
0.1uF
U5
C3
Capacitance
15pF
U6
C19
Capacitance
15pF
C13
Capacitance
0.1uF
C1
Capacitance
0.1uF
C22
Capacitance
0.1uF
C2
Capacitance
0.1uF
C8
Capacitance
0.1uF
C11
Capacitance
1nF
C16
Capacitance
47uF
C6
Capacitance
0.1uF
C14
Capacitance
0.1uF
C20
Capacitance
0.1uF
C4
Capacitance
0.1uF
C5
Capacitance
47uF
U7
C18
Capacitance
4.7uF
J2
L3
Inductance
Inductance
Q2
Note 1
C21
Capacitance
4.7uF
D2
U1
Part Type
Integrated Circuit
Y1
Frequency
12MHz
C29
Capacitance
Capacitance
U2
D1
C7
Capacitance
0.1uF
J4
J1
C12
Capacitance
4.7uF
C17
Capacitance
4.7uF
C23
Capacitance
Capacitance
J5
C24
Capacitance
Capacitance
C9
Capacitance
4.7uF
IC1
LED1
Test Point 1
SW1
R36
Resistance
47kΩ
LED2
K1
Logo1
L2
Inductance
2.2uH
H2

Refine this doc
Ask about this doc
Markdown Style Guide
This document demonstrates the main Markdown styles you can use in Flux project docs, but in a format that also resembles a realistic electronics engineering note. Think of it as a hybrid between a style demo and an example design brief for a small controller board.

Project Summary (h2)
PICO Smart Automation Controller (h1)
Document status (bold): Draft
Revision (bold): Rev A
Owner (bold): Hardware Team
Last updated (bold): 2026-03-20
This example project targets a compact automation controller with:
  • 24 V industrial input
  • 3.3 V digital logic rail
  • Relay or MOSFET outputs for external loads
  • Sensor and communications headers
  • A small MCU for automation logic
The goal here is not to define the final design, but to show how a real project document can use Markdown for structure, readability, and collaboration.
Headings (h2)
Heading 1
Heading 2
Heading 3
Heading 4
Headings are useful for turning long design notes into something scannable.
Text Formatting (h2)
  • Plain text for normal notes
  • Bold for critical requirements or values
  • Italic for emphasis or comments
  • Bold italic for high-priority warnings
  • Strikethrough for deprecated ideas or rejected options
  • Inline code for net names, register fields, commands, or property names
Example sentence:
The controller shall accept 24 V nominal input, regulate to 3.3 V, and expose a UART_DEBUG interface for bring-up.
Requirements (h2)
Bullet List (h3)
  • Input voltage range should tolerate typical industrial supply variation
  • Digital domain should run from 3.3 V
  • External I/O should be clearly labeled
    • Inputs: dry contact or logic-level sensing
    • Outputs: protected low-side switching
  • Status indication should include at least one power LED
Numbered List (h3)
  1. Define power architecture
  2. Select control MCU and support circuitry
  3. Partition field I/O from logic domain
  4. Review manufacturability
    1. Check footprint completeness
    2. Check assembly access and connector placement
Task List (h3)
  • Create initial requirements doc
  • Define top-level power rails
  • Confirm connector pinout with mechanical team
  • Finalize protection strategy on field inputs
  • Review BOM cost target
Notes and Callouts (h2)
Design note (blockquote + bold) Keep noisy switching paths compact and separated from sensitive analog or communication nets.
In a real project, this style works well for reminders, review findings, or manufacturing notes.
Open question (blockquote + bold) Should the field I/O connector use pluggable terminals or a fixed shrouded header?
Links are handy for datasheets, manufacturing rules, compliance references, and issue trackers.
Interface Overview (h2)
Top-Level Signal Table (h3 + table)

Table


InterfaceDirectionVoltage DomainPurposeNotes
VIN_24VInput24 VMain power inputReverse-polarity and surge protection recommended
3V3Internal rail3.3 VMCU and logic supplyDecouple close to each IC
UART_DEBUGBidirectional3.3 VDebug and firmware bring-upKeep accessible during validation
I2C_SENSBidirectional3.3 VSensor expansionPull-ups required on bus
DO_1..4OutputField domainLoad drive outputsAdd flyback strategy if inductive loads are expected
Example Parameter Table (h3 + table)

Table


ParameterTargetMinMaxNotes
Input voltage24 V18 V30 VIndustrial nominal input
Logic rail3.3 V3.2 V3.4 VTight regulation preferred
Ambient operating temp25 C-20 C60 CExample environmental target
Output current per channel500 mA0 mA1 A peakDepends on switching device and thermal design
Architecture Notes (h2)
Functional Blocks (h3)
  • Input protection
  • DC/DC or regulator stage
  • MCU and clocking
  • Communications and debug
  • Output drivers
  • Connectorized field interface
Example Design Intent (h3)
The board should be easy to assemble, easy to bring up, and tolerant of common wiring mistakes. Early revisions should prioritize debuggability over extreme density.
Code Blocks (h2)
JSON Example (h3 + fenced code block)

JSON


{
  "project": "pico-smart-automation-controller",
  "revision": "A",
  "powerInput": "24V",
  "logicRail": "3.3V",
  "status": "draft"
}
Python Example (h3 + fenced code block)

Python


vin = 24.0
vout = 3.3
iin = 0.12
pin = vin * iin
print(f"Estimated input power: {pin:.2f} W")
Bash Example (h3 + fenced code block)

Bash


echo "Export BOM"
echo "Run review checks"
echo "Prepare manufacturing package"
Net Naming Example (h3 + fenced code block)

Text


VIN_24V
GND
3V3
UART_TX
UART_RX
I2C_SCL
I2C_SDA
DO_1
DO_2
DO_3
DO_4
Horizontal Rule (h2)

Embedded Media Syntax (h2)
Markdown image syntax can be used in docs when you have an image URL:

Md


![Board render](https://example.com/board-render.png)
That is useful for:
  • Layout screenshots
  • Block diagrams
  • Test setup photos
  • Thermal plots
Mixed Formatting Example (h2)
During bring-up, verify that VIN_24V is present, confirm the 3.3 V rail is stable, inspect UART_DEBUG, and link any relevant test report in a sentence like this: Bring-up Checklist.
Escaping Characters (h2)
Use backslashes to escape characters when you want them rendered literally:
*not italic*
# not a heading
`not code`
This is useful for docs that explain Markdown itself.
Mermaid Diagram (h2)

Diagram


24V Input Input Protection Power Regulation 3.3V Rail MCU Digital Outputs Sensor Interface Debug UART
Review Section Example (h2)
Risks (h3)
  • Thermal rise may be significant if linear regulation is used from 24 V to 3.3 V
  • Connector pinout ambiguity can create installation errors
  • Inductive loads may require suppression at the board output or at the load
Mitigations (h3)
  1. Prefer efficient regulation for the main logic rail
  2. Label all field terminals clearly in schematic and silkscreen
  3. Reserve footprint space for protection or snubbing where appropriate
Decision Log (h2 + table)

Table


DateDecisionStatusRationale
2026-03-20Use Markdown doc for project notesAcceptedEasy to maintain in project files
2026-03-20Keep early architecture document lightweightAcceptedFaster iteration during concept phase
2026-03-20Delay final connector choiceOpenMechanical constraints still pending
Final Notes (h2)
  • Keep documents short enough to scan quickly
  • Use headings to separate architecture, requirements, and review notes
  • Use tables whenever information is structured
  • Use code fences for data, commands, and naming examples
  • Use blockquotes for warnings, tips, and unresolved questions
If you want, this doc can also be evolved into a project specification template, bring-up checklist, or design review report.
  • Markdown Style Guide

  • Project Summary (h2)

  • PICO Smart Automation Controller (h1)

  • Headings (h2)

  • Heading 1

  • Heading 2

  • Heading 3

  • Text Formatting (h2)

  • Requirements (h2)

  • Bullet List (h3)

  • Numbered List (h3)

  • Task List (h3)

  • Notes and Callouts (h2)

  • Links (h2)

  • Interface Overview (h2)

  • Top-Level Signal Table (h3 + table)

  • Example Parameter Table (h3 + table)

  • Architecture Notes (h2)

  • Functional Blocks (h3)

  • Example Design Intent (h3)

  • Code Blocks (h2)

  • JSON Example (h3 + fenced code block)

  • Python Example (h3 + fenced code block)

  • Bash Example (h3 + fenced code block)

  • Net Naming Example (h3 + fenced code block)

  • Horizontal Rule (h2)

  • Embedded Media Syntax (h2)

  • Mixed Formatting Example (h2)

  • Escaping Characters (h2)

  • Mermaid Diagram (h2)

  • Review Section Example (h2)

  • Risks (h3)

  • Mitigations (h3)

  • Decision Log (h2 + table)

  • Final Notes (h2)

Assets

NextPCB Logo.svg

NextPCB Logo Longer TitleDefault
icon__boards.png

icon__boards.png

icon__boards

vasy_skral-pico-smart-automation-controller-nextpcb-1-4-layer-standard-constraints.stl

vasy_skral-pico-smart-automation-controller-nextpcb-1-4-layer-standard-constraints
PICO Smart Automation Controller image.png

PICO Smart Automation Controller image.png

PICO Smart Automation Controller imageThumbnail
PICO Smart Automation Controller [Prod_V1_AUTO_NET_CLASS_12-10] thumbnail
Use this template if you plan to get your 1-4 layer boards manufactured with HQ NextPCB (nextpcb.com). This template is designed for generic designs to minimize unnecessary costs and complications where possible.
#project-template #template #manufacturer-design-rules Here’s a simple bogus Mermaid diagram you can paste and render:

Diagram


box is empty box has stuff shrug "Start" "Open Box" "Find Blue Banana" "Ask Why" "Do Nothing" "Finish"

Properties

1 oz
0.5 oz
Green

Pricing & Availability

Distributor

Qty 1

Arrow

$2.64–$3.30

Digi-Key

$0.95

HQonline

$5.36–$5.37

LCSC

$13.52–$13.64

Mouser

$10.79

TME

$2.58

Verical

$2.77–$3.61

Controls