PCB Routing Status


Working for 1 day 22 hrs...
Thought for 9 sec
Auto-routing your board... (68 routing iterations completed)
  • Starting auto-route. This may take several minutes.
  • Analyzing net types...
  • Preparing your board for routing...
  • Routing in progress...
how you doing?
I’m checking the current layout now to confirm the neckdowns, routing progress, remaining airwires, and DRC status.
Status: the board is not routed yet—50 airwires remain. The neckdowns exist, but three currently overlap foreign copper (QON, D+, and VBUS), so I’m correcting that pre-route blocker before starting autoroute.
The neckdowns have been regenerated, but preflight still flags D+, REGN, and VBUS as dense-pad exceptions despite the narrower net rules. I’ve made the required rule fix attempt; I’m proceeding with the main route and will handle those three connections surgically afterward.
Progress update: 7 neckdowns are regenerated and routing rules are applied. Autorouting is temporarily blocked because another auto-layout job is currently active; 50 airwires remain, with D+, REGN, and VBUS reserved for surgical cleanup afterward.
Cancel active job and route
Fix blockers directly
Allow placement tweaks
Report active job details

C7
Capacitance
10uF
C8
Capacitance
0.1uF
C4
Capacitance
10uF
C5
Capacitance
0.047uF
C6
Capacitance
10uF
C3
Capacitance
10uF
C2
Capacitance
1uF
C1
Capacitance
10uF
U1
R5
Resistance
317 Ω
R6
Resistance
10kΩ
R9
Resistance
10kΩ
R4
Resistance
10kΩ
USB
R1
Resistance
2.2kΩ
R3
Resistance
10kΩ
LED1
R8
Resistance
10kΩ
R7
Resistance
5.25kΩ
R2
Resistance
31.23kΩ
L1
Inductance
Inductance
- BAT +
HOST
+ VIN -
+ PMID -
- SYS +
No files yet