PCB Routing Status


Working for 1 day 23 hrs...
Thought for 9 sec
Auto-routing your board... (68 routing iterations completed)
  • Starting auto-route. This may take several minutes.
  • Analyzing net types...
  • Preparing your board for routing...
  • Routing in progress...
how you doing?
I’m checking the current layout now to confirm the neckdowns, routing progress, remaining airwires, and DRC status.
Status: the board is not routed yet—50 airwires remain. The neckdowns exist, but three currently overlap foreign copper (QON, D+, and VBUS), so I’m correcting that pre-route blocker before starting autoroute.
The neckdowns have been regenerated, but preflight still flags D+, REGN, and VBUS as dense-pad exceptions despite the narrower net rules. I’ve made the required rule fix attempt; I’m proceeding with the main route and will handle those three connections surgically afterward.
Progress update: 7 neckdowns are regenerated and routing rules are applied. Autorouting is temporarily blocked because another auto-layout job is currently active; 50 airwires remain, with D+, REGN, and VBUS reserved for surgical cleanup afterward.
Cancel active job and route
Fix blockers directly
Allow placement tweaks
Report active job details

U1
C5
Capacitance
0.047uF
L1
Inductance
Inductance

Neckdown-Fixture-BQ24295