This document records the schematic-side changes, verifications, substitutions, exports, and engineering clarifications made during the design discussion.
Initial schematic build
- Built the schematic from the project requirements document.
- Limited scope to schematic work only; no PCB routing was included at this stage.
- Verified library availability before proceeding.
Part verification and substitutions
- Confirmed library availability for the required BOM parts before placing them.
- Substituted U2 and U3 from MPU-6050 to ICM-20689 QFN-24 because MPU-6050 was not available in the Flux library.
- Used the JST GH 1.25 mm 5-pin horizontal SMD connector implementation for J1.
Components added
- U1: STM32G030F6P6 in TSSOP-20
- U2, U3: ICM-20689 in QFN-24 4x4 mm
- U4: AMS1117-3.3 in SOT-223
- J1: JST GH 1.25 mm 5-pin SMD horizontal connector
- C1-C12 capacitors
- R1-R7 resistors
- TP1-TP4 test points
- MH1-MH4 non-plated mounting holes
Power network implementation
- Wired +5V from J1 to the AMS1117 input stage.
- Wired the 3.3V rail from AMS1117 output to the MCU and both IMUs.
- Added local bypass and regulator support capacitors.
- Connected all required ground pins to GND.
Signal network implementation
- Wired the main I2C bus between J1 and the MCU.
- Wired the sub I2C bus between the MCU and the two IMUs.
- Wired AD0, REGOUT, CPOUT/nCS, BOOT0, NRST, SWDIO, and SWCLK-related signals.
- Kept designated ICM-20689 NC-type pins untouched.
Schematic refinements
- Added a proper NRST circuit with a 10 kOhm pull-up to VCC_3V3 and a 100 nF capacitor to GND.
- Renamed auto-generated nets to functional names where possible, including NRST, REGOUT_U2, REGOUT_U3, CPOUT_U2, CPOUT_U3, SWDIO, and related debug/reset nets.
- Clarified that the STM32 composite labels in this package correspond to alternate functions on a single physical pad rather than separate shorted pins.
- Confirmed the effective I2C mapping on the selected MCU/package implementation.
Engineering notes captured
- Documented that ICM-20689 Pin 20 is used as CPOUT in I2C mode and that the 2.2 nF capacitors on C11/C12 are intentional.
- Documented the STM32 I2C pin remap interpretation for this symbol/package.
- Documented the programming and debug scheme using SWDIO, SWCLK/BOOT0 shared pin behavior, and ST-Link flashing.
ERC and review status
- Ran ERC and fixed real connection issues during schematic refinement.
- Final accepted state reached 0 errors and about 16 warnings.
- Acceptable floating warnings remained on unused STM32 GPIOs, J1 pin 5 and related unused connector pins, and intentionally unconnected IMU INT pins.
Footprint verification and updates
- Verified footprint assignments for major ICs, connector, passives, test points, and mounting holes.
- Found mounting hole property inconsistency and corrected the mounting hole settings to 2.2 mm NPTH intent.
- Changed C1 and C3 footprint from SMD_0805_2012Metric to SMD_0603_1608Metric while keeping value and other requested properties unchanged.
Exports and manufacturing data
- Re-ran ERC before export and confirmed 0 errors and about 16 warnings.
- Exported updated netlist and BOM outputs after the C1/C3 footprint change.
- Selected the JLCPCB-specific BOM as the correct file for JLC submission.
- Checked the JLCPCB BOM columns and confirmed key manufacturing fields were present, while noting quantity and explicit MPN columns were not separately provided.
Open schematic-side notes
- Manual no-connect markers may still be needed on certain intentionally unused pins depending on final review workflow.
- Net naming around shared SWCLK/BOOT0 behavior should continue to respect the package's shared physical pin representation.
原理图变更记录(中文版)
项目
IMU-Bridge-2026
文档说明
本文档记录本次交流中与原理图相关的主要工作内容,包括:器件选型替代、原理图搭建、网络连接、工程性修正、ERC 状态、封装核对,以及导出与制造文件相关结论。中文版用于补充英文版,方便后续在项目内部评审、交接和复查时直接引用。
1. 初始原理图搭建
- 按项目需求文档完成了原理图的第一版搭建。
- 本阶段工作范围仅限原理图,不包含 PCB 走线。
- 在开始放置元件之前,先对 BOM 中的关键器件做了库可用性确认。
2. 器件核对与替代
- 在 Flux 库中核对了主要 BOM 器件是否可用。
- 因 MPU-6050 不可用,U2 和 U3 统一改用 ICM-20689 QFN-24 4x4 mm。
- J1 采用 JST GH 1.25 mm 5-pin horizontal SMD 的对应实现。
- 这一替代不改变项目功能目标,仅用于满足库可用性与封装落地要求。
3. 已添加元件范围
已完成放置的器件包括:
- U1:STM32G030F6P6,TSSOP-20
- U2、U3:ICM-20689,QFN-24 4x4 mm
- U4:AMS1117-3.3,SOT-223
- J1:JST GH 1.25 mm 5-pin 侧插/卧式贴片连接器
- C1-C12:电容
- R1-R7:电阻
- TP1-TP4:测试点
- MH1-MH4:非电镀安装孔
4. 电源网络实现
- 完成了从 J1 输入到 U4 稳压输入端的 +5V 连接。
- 完成了从 U4 输出到 MCU 与两颗 IMU 的 VCC_3V3 供电分配。
- 为稳压器、MCU 和 IMU 加入并连接了相应去耦/支撑电容。
- 所有要求接地的电源地和芯片地引脚都已连接到 GND。
5. 信号网络实现
- 完成了主 I2C 总线(连接器到 MCU)的连接。
- 完成了子 I2C 总线(MCU 到两颗 IMU)的连接。
- 完成了 AD0、REGOUT、CPOUT/nCS、BOOT0、NRST、SWDIO、SWCLK 等相关网络的连接。
- ICM-20689 中标注为 NC 类型的引脚保持不连接,也未强行添加 no-connect 标记,避免 ERC 冲突。
6. 原理图工程化修正
- 为 NRST 增加了完整的复位网络:
- 一个 10 kOhm 上拉电阻连接到 VCC_3V3
- 一个 100 nF 电容连接到 GND
- 将自动生成的
Net 1、Net 2 一类网络尽可能改为有工程含义的名称,例如:
NRST
REGOUT_U2
REGOUT_U3
CPOUT_U2
CPOUT_U3
SWDIO
- 对 STM32 该封装下的复合引脚标签做了说明:
- 像
PB3/PB4/PB5/PB6、PB7/PB8 这类标签代表同一个物理封装焊盘上的可复用功能,不是多个 GPIO 被短接在一起。
- 结合该封装和符号表示方式,确认了当前 I2C 有效映射在工程上是可接受的。
7. 设计说明已单独沉淀
已将若干容易误解的设计点记录为项目说明,主要包括:
- ICM-20689 在 I2C 模式下,Pin 20 的
nCS 实际作为 CPOUT 使用,因此 C11/C12 = 2.2 nF 是正确且有意为之的设计。
- STM32 当前符号中的 I2C 复合引脚命名,需要按“一个物理 pad,多种复用功能”的方式理解。
- 程序下载和调试采用 SWD:
SWDIO 对应 PA13
SWCLK/BOOT0 对应共享物理引脚
- 使用 ST-Link 烧录,不依赖 UART bootloader 路径。
8. ERC 状态
- 在原理图细化过程中运行了 ERC,并修复了真实连接错误。
- 最终接受状态为:
- 这些保留 warning 主要来自:
- 未使用的 STM32 GPIO
- J1 上未使用的引脚
- 两颗 IMU 上故意不连接的
INT 等引脚
- 这些 warning 属于当前设计阶段可接受项,不代表功能性错误。
9. 封装核对与更新
- 已核对主要 IC、连接器、无源器件、测试点和安装孔的封装/footprint 是否符合预期。
- 发现安装孔属性曾存在不一致,之后已按 2.2 mm NPTH 设计意图修正。
- 根据后续要求,将 C1 与 C3 的封装从
SMD_0805_2012Metric 改为 SMD_0603_1608Metric。
- 修改时保持了其余指定属性不变,例如数值和料号信息未被额外改动。
10. 导出与制造资料
- 在导出前重新执行 ERC,并确认仍为 0 errors / 约 16 warnings。
- 在 C1/C3 封装更新后重新导出了网表和 BOM。
- 针对嘉立创(JLC)投产,确认应优先采用 JLCPCB 专用 BOM。
- 对 JLCPCB BOM 的列进行了检查,确认关键制造字段存在,但也记录了某些字段(如独立 Quantity、显式 MPN)并未以单独列提供。
11. 仍需注意的原理图事项
- 某些故意未使用的引脚,后续在人工收尾阶段可能仍需要补充 no-connect 标记。
- 与
SWCLK/BOOT0 共享物理脚位相关的网络命名,在后续文档或评审中应持续说明其“共享 pad”的事实,避免误判为命名错误或连接错误。
- 如果未来更换 MCU 封装或符号库版本,I2C 与调试引脚的解释需要重新核对,不应直接沿用当前结论。
12. 中文版补充结论
从原理图阶段来看,本项目已经完成了从“需求驱动搭建”到“工程化可审查状态”的主要工作:
- 功能网络已经建立
- 关键器件替代已经确认
- NRST、I2C、调试接口等关键点已有设计说明
- ERC 已达到可接受状态
- 封装和制造文件已经过一轮核对与更新
这意味着后续工作的重点已经从“补原理图”转向“结合 PCB 物理实现约束继续验证布局与布线可行性”。