I arranged all 91 components into functional blocks, corrected R7’s orientation, and continued cleaning up wires and labels. The last verified comparison showed all electrical connections and component values unchanged, but the drawing cleanup and final review remain incomplete; I saved the handoff in Schematic Drafting Resume Notes.
Execution stopped because your ACUs ran out.