Placement qualification resume handoffSession status — 2026-10-27
User approved footprint/header qualification and local placement repairs, followed by remaining routing and current/thermal validation. The existing Kelvin integration work was resumed with that scoped brief. A completion notification arrived, but its final report could not be retrieved before ACUs ran out. No specific PCB change or check result from this pass has been reconciled. Inspect current live state and recover the completed report before editing again.
Recover first
Existing executor reference: 802f980f-19ab-4c52-8a2d-bbbef2368490, name Kelvin Shunt Integration. Reuse its persisted work; do not duplicate writers or repeat failed research.
I resumed the footprint/header qualification and local placement repair pass. It reported completion, but I could not retrieve its results, so no new PCB fixes or check results are independently confirmed.
I saved the resume handoff. Next is to reconcile that pass, then continue routing and current/thermal validation; the last verified baseline remains 169 airwires and 12 ERC errors, and the board is not ready to power or manufacture.
ok, how many more working hours are needed if no further changes are required for this project?
what percentage are we completion wise before we have a prototype to send off to be built for testing?
I estimate 60–65% complete toward a fabrication-ready prototype, with 25–50 engineering hours remaining if the requirements stay fixed and no major redesign is needed. That excludes fabrication, shipping, firmware development, and bench testing.
The remaining effort is mainly footprint/placement qualification, finishing routing, resolving ERC/DRC findings, checking current and thermal margins, and finalizing the BOM and manufacturing files. The last verified baseline was 169 airwires and 12 ERC errors; the latest repair pass has not yet been reconciled, so this is a planning estimate—not a delivery commitment or confirmation of the 30 A rating.
No new checks were performed this session. Execution stopped because your ACUs ran out.
I can’t reliably estimate the remaining ACUs. There’s no fixed conversion from engineering hours to ACUs, and I don’t have this project’s usage history. My earlier 25–50-hour estimate should not be used to calculate an ACU budget.
The practical approach is to measure ACU use over one bounded milestone—reconciling the repair pass and clearing placement/ERC blockers—then estimate routing and validation from that actual usage. Flux support may also be able to help interpret your project’s consumption before you purchase more.
No new project work was performed. Execution stopped because your ACUs ran out.
Geometry/local-repair phase started — interrupted before mutations
No PCB/schematic changes made in this phase. Execution stopped because ACUs ran out during read-only preparation. Previous169-airwire checkpoint remains the last routing read, not a freshly recounted value for this phase. Parent approved local header/shunt/neighbor relocation and regulator bank repairs while preserving fixed edge interfaces, outline and six isolated Kelvin nets; return for reconciliation before major routing.
Fetched pcb-placement, physical-facts-research, smps-power-stage-placement/reference, board-standard-interface-geometry/sources. Requested part-quality-issues skill does not exist; tool explicitly skipped it. Prior J6 quality report must not be duplicated.
Fresh regulator evidence: scoped SVG read shows U3 Top(-10.3,8.7)90°; VIN(-9.35,7.56), GND(-11.25,7.56), SW(-10.3,7.56), FB(-9.35,9.84), BOOT(-11.25,9.84), EN(-10.3,9.84), all mm. Bottom C1(-10.4,7.75)180°, C2(-10.4,5.9)180°, C3(-10.4,9.4)180°; C1/C2 are10uF with1.90mm pad pitch, C3 is100nF with0.96mm pad pitch. Bottom C4(-8.05,5)270° and C5(-6.4,5)270° are22uF/1.90mm pitch. C6(-8.2,9.4)90°100nF, R3(-8.5,11.3)0°, R1(-5.8,10.05)90°, R2(-5.8,8.25)90°. L1 Top(-8.6,3.2)0°, SW pad1(-10.45,3.2), output pad2(-6.75,3.2). These are actual live rendered coordinates; no move applied.
Fresh switching-stage check still has3 errors: C1 rotate0°, C4 rotate90°, C1 described as HF cap between C2/C3. Important discrepancy: live values/roles show C3=100nF VIN high-frequency bypass, C1=C2=10uF; do not blindly treat C1 as the physical HF bypass based on checker naming. Verify schematic values/properties and why checker selected C1 before bank reorder. TI official source https://www.ti.com/lit/ds/symlink/tps56339.pdf retrieved this phase confirms synchronous buck and pin1GND,2SW,3VIN,4FB,5EN,6BOOT, and recommends the0.1uF bypass especially close to VIN/GND. Actual smaller C3, not merely the check label, must be placed for that function. All bank pads/neighbor clearance and route invalidation need checking before any move. No speculative candidate bank coordinates are approved.
CSS alternative source search: official current PDF https://www.bourns.com/docs/product-datasheets/css4j-4026.pdf?sfvrsn=675f9af1_39 surfaced; extracted text again lists10.60/5.50/5.60/7.30/0.90/0.80mm but no qualified arrow associations. Search did not expose a usable open-source CSS footprint. Manufacturer page https://bourns.com/products/resistors/details/metal-strip/css4j-4026__ has Design Files; inspect actual download links next rather than repeat identical text extraction. Exact-part EasyEDA/JLC listing https://jlcpcb.com/partdetail/BOURNS-CSS4J_4026K2L00F/C2076167 links EDA CAD and may offer another source, but no model retrieved or verified. Search returned a nonexact CSS4J-4026R-L500F SnapMagic model: do not substitute it as proof of exactK-2L00 lands without dimensional comparison. Current official PDF text appears newer in power rating than older distributor data; do not mix revisions or treat search OCR electrical units as reliable.
Disposition: completed source/geometry inspection only; failed/unattempted to finish CSS/J6 qualification, local placements, ERC metadata or fresh final full audit because execution stopped before mutation. Resume with direct Samtec drawings, actual readable CSS land image/design file and independently safe regulator corrections; no guessed offsets, no new quality report unless a new proven defect, no manufacturing/current-capacity claim.
Actual progress persisted: live entry176 airwires (not206); final 169 airwires, zero redundant groups. This pass closed7 connections in5 successful targeted calls. Relative to the requested historical206 baseline the project has37 fewer airwires; only7 are attributed to this pass. Exact25.4×50.8mm outline, all placement, fixed interfaces, existing working copper and six isolated Kelvin nets preserved. No historical coordinate-compensation edit and no current coordinate disagreement observed.
Completed changes
Table
Net
Connected pair
Width
Added centerline length / reported vias
BUCK_FB
R1:P2–R2:P1
0.254mm
3.777mm / no via reported
BUCK_FB
R1:P2–U3:FB
0.254mm
4.165mm /1 via
BUCK_BOOT_CAP
C6:P1–R3:P2
0.254mm
2.939mm / no via reported
BUCK_BOOT
R3:P1–U3:BOOT
0.254mm
6.713mm /1 via
MOTOR_TEMP_EXT
R37:P1–R38:P1
0.5mm
1.010mm / no via reported
MOTOR_TEMP_EXT
R37:P1–J3:6
0.5mm
62.181mm /5 vias
DRV_VDSTH
R20:P1–R19:P2
0.15mm
1.438mm / no via reported
BUCK_FB, BUCK_BOOT_CAP, BUCK_BOOT and MOTOR_TEMP_EXT now have no airwires. DRV_VDSTH remains partially connected. New regulator feedback/bootstrap routes and especially the long temperature detour are connectivity progress, not a signed-off switching-loop/noise result: feedback has a via and bootstrap feed6.7mm/one via; temperature is62.2mm/five vias. Review these paths and loop returns before power-up; retain completed copper until an explicitly scoped optimization is approved.
Applied one compatible rule batch: only HALL_A_EXT/HALL_B_EXT/HALL_C_EXT signal-net trace widths reduced from0.5mm to0.15mm (board minimum) to permit fine-pitch ESD escapes. These are logic inputs, not sensor5V supply or motor current. Fresh tree confirms all three effective widths0.15mm and minTraceWidth0.15mm. No power/current-path width was reduced. HALL_B_EXT received one retry after this real width change; it was rejected and is stopped at two attempts.
Procedure, exclusions and retained limits
Fresh stackup unchanged: Top/Bottom35µm signals, Mid-Layer1 ground35µm, Mid-Layer2 power35µm, through via0.6/0.3mm. Routing orientations Top0°/Bottom90°; inner layers retain default strategy; BUCK feedback/bootstrap prefer Top. No board/profile/clearance changes. Preflight again returned only13 INFO advisories (same-net overlapping MOSFET lands plus via-at-SMD adaptation), no blocking anomalies. Entry routing-state had no redundant copper, so none deleted.
Excluded from generic power routing: VBAT, PHASE_A/B/C, SHUNT_A_P/B_P/C_P and the motor-current portions of GND. All six SHUNT_[A-C]SENSE[P/N] were preserved untouched. J6-connected3V3/NRST/SWCLK/SWDIO endpoints and unresolved shunt/header geometry remain deferred; unresolved5V/BUCK_SW also require current/loop-aware treatment. No30A continuous/50A burst branch was signal-width autorouted. Full-board autorouting and global neckdown generation remain unattempted: both APIs are global with no net/component exclusion parameter; the existing force/phase defaults are not current-qualified. This was not used to freeze independent routing: seven independent connections were completed. Do not treat a Forbidden Layers workaround as validated exclusion without checking its effect on existing copper/DRC. Five successful targeted calls consumed this pass; global jobs0. No repeated full-board nonprogress jobs were run.
Failed or rolled-back items (no repeated guessing)
PWM_A_H first attempt0.254mm: no path, blocked by C26:P2 ground, adjacent U2 PWM pads and existing SHUNT_A_P trace3d32942d…. PWM_A_L first attempt0.15mm: no path, U2:NSTBY/GND and C25:P1/P2 block the via escape. Neither retried.
DRV_FLAG first attempt0.15mm: both branches no path. U2:VDSTH, R19/R20, C27 and SHUNT_A_P traces3d32942d…/eef9bd30…/8fa0af95… obstruct escape. Working source-reference copper not deleted.
DRV_ENABLE0.254mm: no path, C23/C24 ground pads, adjacent U2 LGC_CAP/NFAULT and SHUNT_A_P reference trace obstruct escape. No retry.
DRV_VDSTH: R20–R19 persisted, but U2:VDSTH–R19 and U2:VDSTH–C23 remained blocked by U2:FLAG and C27/R19 pads. No retry; fresh live endpoint for first open is U2:VDSTH–trace7e6dd079-0e02-4789-80de-40879fa6dd9e.
HALL_B_EXT first0.5mm attempt: no path past D1:IO1/GND and R32/R33 escape; after actual0.15mm net-rule correction, retry was atomically rejected with 'No routes were applied because the batch would introduce 1 checked design-rule error. Airwires: 1'. Stop at two attempts. HALL_C_EXT first0.15mm attempt: same one-airwire checked rejection. No copper persisted from either rejected batch.
DRV_NFAULT0.15mm batch: atomic rejection 4 checked errors, Airwires:4. DRV_CREF0.15mm batch: U2:CREF escape no-path and other pairs atomically rejected 2 checked errors, Airwires:2. VBAT_SENSE0.254mm: C44–R44 no-path(U5:Y, existing Hall_C copper and R44/C44 pads), other pairs atomically rejected 1 checked error, Airwires:1. No repeated rejection attempts.
CURRENT_B C26:P1–U1:PA1 first0.254mm attempt: no path past C26:P2 ground land. CURRENT_A previous blocker remains unchanged. Moving/rotating filter capacitors or rerouting existing ground/sense copper needs a concrete approved local plan rather than repeated searches.
Checked-airwire rejection is now a reproducible different symptom from the historical1.90mm report: the mutation guard refused proposed geometry and preserved the original board. Root cause is unknown; it might be a genuine connectivity regression in generated geometry or validator/router inconsistency. No evidence supports suppressing checks or calling this a confirmed transform bug. HALL_B_EXT two-attempt budget and repeated atomic-guard pattern are affected-operation stop reasons; other unattempted safe controls are not thereby proven unroutable.
Fresh verification and phase table
Final complete routing-state read:169 airwires, zero redundant copper; all six sense nets absent from open list. Fresh DRC category contains169 ERROR/WARNING entries, all airwires; no other active DRC error/warning reported. Fresh ERC still12 Undriven Nets (sixPWM, CLK, SDI, NCS, EN, NSTBY, VDSTH), not suppressed. Fresh non-schematic-legibility census434 ERROR/WARNING entries, down exactly7 from441 entry baseline. Remaining265 non-airwire entries persist; prior detailed decomposition was18 placement errors/21 nonsilk warnings,132 silk warnings,82 missing-MPN errors,12 ERC errors. This pass did not individually re-inspect each label/MPN finding. Component-project reviews again explicitly do not apply. Manufacturing/power readiness remains failed.
Table
Phase
FORCE_P
FORCE_N
SENSE_P/N
SLS/source reference
A/R16
Trace274fc53f…–R16:FORCE_P open
no shuntGND airwire
both no opens
SLS1 no open
B/R17
R17:FORCE_P–Trace1da7797b… open
no shuntGND airwire
both no opens
R14:P2–Q5:S_1 and U2:SLS2–R14:P2 open
C/R18
Q6:S_1–R18:FORCE_P open
no shuntGND airwire
both no opens
Q6:S_1–R15:P2 and U2:SLS3–Q6:S_3 open
Ground opens still exactly C19:P2–U2:AGND and C20:P2–U2:GND. FORCE_N continuity does not certify return-plane current. Existing1.2mm source straps and0.6/0.3mm vias have not been qualified as a complete30A/50A network; full current/thermal analysis remains open.
Exact remaining inventory delta and next bounded work
The176-pair inventory in the preceding2026-10-26 section remains exact after these explicit changes: remove BUCK_FB's two pairs, BUCK_BOOT_CAP's one, BUCK_BOOT's one, MOTOR_TEMP_EXT's two, and DRV_VDSTH R20:P1–R19:P2; replace DRV_VDSTH U2:VDSTH–R19:P2 endpoint with U2:VDSTH–trace7e6dd079-0e02-4789-80de-40879fa6dd9e. All other listed endpoints remain unchanged in the final169-pair read. Thus no remaining connection is hidden by a summary-only net list.
Completed: actual7-pair progress,3 scoped signal-width corrections, preflight/stackup reads and final routing/ERC/DRC checks. Failed/partial: named no-path and checked-rejection batches above, stopped without destructive fallback. Unattempted: general placement changes, global routing/neckdowns without safe exclusion, shunt/J6 asset repair and other controls in remaining inventory. Exact missingCSS/J6 manufacturer datums remain as documented below; no repeated unsuccessful research.
Minimum upstream actions: (1) diagnose checked-airwire guard failures from the recorded HALL_B/C/DRV_NFAULT examples before repeating them; support can inspect router/validator generated geometry, no guessed offset; (2) plan local C25/C26/C27 and U2 escape corridors using live pad geometry while preserving all Kelvin pickups; move only within approved local scope after an explicit feasible corridor is established; (3) scope neckdowns/autorouter away from unqualified VBAT/phase/force paths, or qualify their widths/geometry before a global job; (4) continue presently unattempted safe digital nets in a new bounded pass. No new user architectural decision is required merely to continue safe routing. Fixed interface movement, general Hall/MCU relayout, clearance/stackup trade-offs or deleting working copper require approval. Do not classify all169 remaining connections as blocked by shunt qualification or historical support issue.
Completed partial routing progress, not overall completion. Live entry baseline was187 airwires, not the historical206; the19-connection difference predates this pass and is not attributed to this work. Removed only the single checker-identified redundant3V3 trace e19ffd25-4bb2-415b-bc1a-111a1393256e. Final read-only routing state: 176 airwires, zero redundant groups. Eleven connections improved in this pass; all six dedicated Kelvin nets remain without airwires, with no sense-copper/placement/net mapping modifications.
Layer Routing Strategy and scope
Outline25.4×50.8mm and every placement retained. Live stackup: four35µm copper layers; Top/Bottom signals, Mid-Layer1 ground, Mid-Layer2 power,0.6mm/0.3mm through vias. Top orientation0°, Bottom90°; inner planes retain their roles and default orientation behavior. GND local reference preferred Mid-Layer1. Manufacturing profile remains custom/unpopulated, despite a populated layout stackup. Board minimum trace width is0.15mm. New local C23 ground signal return uses0.15mm, not a motor-current return; new control/Hall logic traces use existing0.254mm signal width. No trace-current or thermal signoff is inferred. Existing VBAT/phase0.3mm and shunt0.254mm net defaults are not qualified for30A; no new generic routing on these nets.
The available whole-board autorouter has no net-exclusion parameter. Whole-board neckdown generation also has no component/net scope and reads presently unqualified force/power widths. Consequently both global operations were unattempted for safety, rather than routing30A branches at signal widths. Used bounded scoped routing instead, leaving J6 and shunt force geometry untouched. Neckdown-generation prerequisite cannot safely be applied globally until power-path rules/geometry are qualified or a scoped generator is available. This is a scope/tool limitation, not a presently reproduced coordinate bug. Preflight completed:13 INFO advisory anomalies only, chiefly same-net overlapping MOSFET lands and a GND via-at-SMD adaptation; no blocking anomaly. No clearances or stackup rules relaxed.
HALL_B: R35:P1–U1:PB11 11.026mm/one via; two local branches still open.
HALL_C: R36:P1–U1:PB12 13.607mm/one via; two local branches still open.
RX_RAW: U5:A–R41:P1 13.223mm/one via; J5:3–U5:A 11.965mm. Complete net connectivity.
RX_DIRECT R41:P2–U1:PA3:40.868mm/one via. Long detour warrants later optimization, but retained verified connectivity rather than deleting working copper.
UART_TX R43:P2–J5:4:17.503mm/one via.
UART_TX_RAW R43:P1–U1:PA2:18.078mm/one via.
Each applied call reported only resolved airwire issues; no introduced checked error was reported. HALL_B/C local attempts each returned two no-path pairs; no retry was made. Main physical blockers are Bottom3V3 bias traces/pads R34–R37, C38–C41 and nearby Hall escape vias. CURRENT_A failed both branches: C26:P1/C27:P1 obstruct C25:P1–R26:P2 and C25:P2 obstructs C25:P1–U1:PA0. BOOT0 failed once: C32:P1/C33:P1 and3V3 trace20080c5b… obstruct the escape.
HALL_A_EXT(0.5mm), RX_INVERTED_RAW, RX_INVERTED, MOTOR_TEMP, SERVO_SIG(0.3mm), DRV_SPI_CLK batches were rejected atomically: exact tool message, 'No routes were applied because the batch would introduce 1 checked design-rule error. Airwires: 1'. No copper from these batches persisted. MOTOR_TEMP additionally showed U2:C_AUX blocked by R21/R22, adjacent U2 pads and protected SHUNT_A_SENSE_N copper. No rejected batch was repeated and no working route removed to force it through. These checked-airwire-regression rejections are separate from geometric no-path findings and do not identify a proven engine/transform root cause. Next troubleshooting should compare the rejected proposed geometry to existing copper or use support telemetry; do not suppress validation.
Fresh checks after routing
Fresh ERROR/WARNING census excluding schematic legibility: 441 findings, decomposed as176 airwire DRC errors +18 placement errors/21 nonsilk warnings +132 silk warnings +82 manufacturing missing-MPN errors +12 ERC errors =288 errors/153 warnings. DRC category query contains only the176 airwire errors; no other active ERROR/WARNING DRC entries were returned. ERC still12 Undriven Nets at U2(sixPWM,CLK,SDI,NCS,EN,NSTBY,VDSTH), unchanged and unsuppressed. Placement remains density1 error, switching-stage3 errors, neckdown14 errors/4 warnings, body2 warnings, decoupling14 warnings, J3 edge1 warning. Neckdown now explicitly enumerates C28,C29,C32,C33,C35,C36,C43; historical earlier text omitted C33 from that enumeration. Component-project checks do not apply and did not run. Existing schematic-legibility findings were not fully recounted in this PCB pass. Board is not safe to manufacture/power.
Exact phase continuity
Table
Phase
FORCE_P
FORCE_N
SENSE_P
SENSE_N
SLS/source reference
A/R16
Trace274fc53f…–FORCE_P open
no shunt GND airwire
no open
no open
SLS1 no open
B/R17
FORCE_P–Trace1da7797b… open
no shunt GND airwire
no open
no open
R14:P2–Q5:S_1 and U2:SLS2–R14:P2 open
C/R18
Q6:S_1–FORCE_P open
no shunt GND airwire
no open
no open
Q6:S_1–R15:P2 and U2:SLS3–Q6:S_3 open
Historical1.2mm source straps are not a signed-off complete30A path. Widths, via counts and thermal/current qualification of the complete force/return network remain unvalidated; continuity alone is insufficient. Exact shunt/J6 missing manufacturer datums remain as documented below; no repetitive extraction attempted.
Complete remaining176-connection inventory
Notation A–B is one live airwire; semicolons separate pairs. Trace IDs are expanded where needed to preserve exact targets. Unless an attempted blockage is specified above, a connection below is unattempted in this bounded pass, not proven unroutable. Reasons for deferral: shunt/J6 qualification for associated geometry; current-aware power-path design for VBAT/PHASE/5V/BUCK_SW; remaining controls require a subsequent scoped pass or safe global-net exclusion. Do not infer all remaining nets are upstream blocked.
Completed: fresh preflight, stackup/rules read, one redundant cleanup, eight persisted scoped routing calls, fresh routing/ERC/DRC census and this inventory. Eleven improved connections are verified, not a full routing completion claim.
Failed/atomic rollback: six named batches above because checked airwire regression; CURRENT_A and BOOT0 no-path; HALL_B/C partially successful. No guessed offset, repeated failed path, or ERC suppression.
Unattempted: global autoroute/global neckdowns (no safe exclusion and unqualified power widths), all remaining inventory not specifically attempted, shunt/header asset repair, power-bank relayout and ERC metadata edits.
Next concrete independent work: a scoped U1/U2 neckdown capability or temporary proven non-destructive net exclusion would permit broad control routing without touching unqualified force paths; otherwise continue another bounded scoped control pass. Resolve checked-airwire-regression telemetry before retrying rejected paths. For Hall/ADC/BOOT no-paths, obtain approval for a targeted escape/decoupler placement change or explicitly approved3V3 reroute respecting blockage outlines; do not delete working3V3 copper without approval. Local power-stage placement approval does not automatically authorize general Hall/MCU relayout.
User decision is needed only for additional placement/rule trade-offs or acceptance of partial result—not to continue safe independent routing. ExactCSS/J6 datums,30A copper/via/thermal design and82 passive MPNs remain separate engineering gates. Historical1.90mm disagreement is not a current proven persistent blocker; no guessed corrective offset applied.
Approved qualification continuation — stopped at evidence gate
No PCB/schematic edits or routing attempts were made. Current coordinate discrepancy is not a confirmed persistent platform bug; qualification, not a guessed transform correction, is the gate for this batch.
CSS recommended-land qualification: failed/incomplete. Followed a new authoritative access route to Bourns current CSS4J PDF, rather than repeating the earlier failed datasheet query. The page-2 extraction confirms listed 0.90, 0.80, 7.30, 5.60, 5.50 and 10.60 mm dimensions, but explicitly cannot resolve arrow endpoints for the four larger dimensions or all pad centers. Direct reading of the previously saved raster URL failed; search context that claims to describe that image is not accepted as image evidence. An older distributor PDF surfaced 10.40 rather than 10.60 mm; do not mix revisions. Missing evidence is readable vector/raster arrow-to-edge associations for the complete four-land geometry, including sense-pad center locations relative to force-pad centers, and selection of the applicable source revision. Therefore no independently qualified new land table exists to apply.
Fresh R16 tree confirms force pads1/4 centers(-4.0259,-0.9017)/(4.0259,-0.9017) mm, sizes2.0066×4.699 mm; sense pads2/3 centers(-4.0259,2.8448)/(4.0259,2.8448) mm, sizes2.0066×0.8128 mm, all footprint-local Top coordinates. This is the present library geometry, not a certified recommended pattern. Mapping remains1 FORCE_P,2 SENSE_P,3 SENSE_N,4 FORCE_N. The difference between library sense-land width and the small dimension in the source is a qualification concern, not sufficient evidence for blindly resizing/recentering routed pads.
J6 registration qualification/repair: failed/incomplete.Official exact Samtec product page confirms the configured six-position, two-row,1.27 mm pitch SMT part and links a Double Row Vertical Surface Mount Footprint and Series Print. HTML extraction did not expose their actual download hrefs; prior series drawing/catalog evidence is still insufficient to tie the imported body/artwork/model datum to all six live copper pads. The product page itself warns a generic2D view may not represent the configured part. Required missing facts are the exact configured body/copper drawing with unambiguous common datum and the imported asset/model internal origin/orientation, not another guessed translation.
Fresh tree confirms local J6 pad columns x=-2.3225/+1.7475 mm, rows y=0.9825/-0.2875/-1.5575 mm, copper size0.740×2.790 mm with pad rotation270°. The six-pad centroid is(-0.2875,-0.2875) mm. Model remains inactive at(-0.253,-0.2828,0.5) mm, rotation(90,90,0)°; these nearly matching centroid offsets alone do not establish correct seating/orientation. Fab asset position(7.8979,0.335) mm and Silk asset position(6.9191,-5.5412) mm/270° remain suspicious, but asset origins need not equal body centers; correction cannot safely be derived from node translations alone. Fixed element(8.77,4.5) mm/270° and all net mappings preserved. Existing quality report remains appropriate.
Routing: unattempted by qualification stop. Fresh complete routing-state read again reports206 airwires and zero redundant traces/groups. Six isolated Kelvin sense nets have no airwires. Exact current phase and three GND opens are unchanged from the table below: A FORCE_P open/SLS1 no open; B FORCE_P plus R14:P2–Q5:S_1 and SLS2–R14:P2 open; C FORCE_P plus Q6:S_1–R15:P2 and SLS3–Q6:S_3 open. FORCE_N has no shunt GND open but current capacity is unverified. Neither the shunt nor J6 qualification gate passed, so no local force/ground/SLS attempt was authorized by these findings.
Checks and other items: DRC/ERC baseline below remains the last full census, not a newly rerun census for this continuation; no design changes occurred. Preserve12 ERC flags: inaccessible electrical metadata was not pursued further or suppressed. Empty wheel-net deletion was optional and remains unattempted; shared Hall/D1 circuitry unchanged. This bounded batch ends here per the instruction to stop when exact qualification cannot be obtained after alternatives. Next concrete input needed: readable manufacturer land-pattern artwork with identifiable arrow endpoints and exact Samtec footprint/model registration data; then reconstruct a dimension/datum table before any pad/asset repair, followed by readback/checks and at most one planned routing attempt per path.
Status
Audit/document batch completed with explicit qualifications below; overall ESC remains incomplete, unsafe to power/manufacture. No PCB/schematic mutations or routing retries in this batch. Prior Oct23 evidence is retained in kelvin-integration-resume-evidence; do not treat its transform observation as a current reproduction. See routing-coordinate-support-report for a key fresh finding: current C19/C20 SVG has no extra mirror and P2 world y=2.15 mm agrees with the historical router start.
Fresh counts and severity
Live project: 110 components, 82 nets, exact25.4×50.8 mm four-layer outline. Routing state: 206 airwires; zero redundant traces/groups. Fresh ERC: 12 Undriven Nets errors (six PWM, CLK, SDI, NCS, EN, NSTBY, VDSTH). Logical connections alone do not clear these errors.
All selected ERROR/WARNING findings excluding schematic legibility total 471, decomposed without summing page-local counts:
ERC:12 errors.
These sum to318 errors and153 warnings,471 total. Separate schematic-legibility query reports66 ERROR/WARNING entries; only first finding inspected, so subtype/severity breakdown not claimed. Full board is not 'only two overlap warnings'. Component-project checks explicitly did not run/apply; absence is not a pass.
Neckdown flags C28,C29,C32,C35,C36,C43 as Bottom power-pad versus Top IC pin plus behind-pin errors, and C29/C32/C35/C36 return-loop warnings. These are checker findings, not permission to move them blindly or proof all bottom decoupling is inherently invalid. Switching checker proposes C1 rotation0, C4 rotation90 and C1 moved to input-bank end. No such changes were applied or geometrically validated. Decoupling warnings: C4,C5,C9–C15,C17,C31–C33,C44. Body warnings: R18/J6 overlap13.07mm² and U4/J6 clearance-only0.00mm². J6 asset registration uncertainty means its calculated body bounds are not authoritative physical dimensions. Summary density layer analysis incorrectly describes all110 parts as Top despite its own table showing Bottom parts; do not use that aggregate recommendation as a placement plan.
Per-phase continuity from current complete routing state
Table
Phase
SENSE_P/N
FORCE_P high-current branch
Source reference
FORCE_N
A/R16
no airwires on either dedicated sense net
source-island trace274fc53f…→R16 FORCE_P open
SLS1 has no remaining open in routing state
no shunt GND open; capacity not signed off
B/R17
no airwires on either dedicated sense net
R17 FORCE_P→source trace1da7797b… open
R14:P2→Q5:S_1 and U2:SLS2→R14:P2 open
same limitation
C/R18
no airwires on either dedicated sense net
Q6:S_1→R18 FORCE_P open
Q6:S_1→R15:P2 and U2:SLS3→Q6:S_3 open
same limitation
GND opens exactly: C19:P2→U2:AGND; C20:P2→U2:GND; C23:P2→R22:P2. No force-current or thermal signoff follows from an absent airwire. Preserve all six isolated sense nets; SLS leads are not substitutes for force copper.
Item dispositions
Completed — fresh routing/ERC and broad DRC census: counts above, current routing listing read in full; all nonsilk placement findings read. Silk total known but every individual label fix not reviewed; schematic legibility census only.
Completed — coordinate/support investigation: current tree confirms ordinary footprint offsets and no demonstrated bad instance transform; current SVG agrees with historical router centers. Root cause and same-snapshot router/DRC/manufacturing consistency unresolved. Standalone support report saved.
Completed with blocker — MCU metadata audit: fresh U1 instance and published-part schematic reads show exact part/version and48 pin names/numbers but neither exposes internal electrical pin types. Actual electrical metadata therefore remains inaccessible through those reads; do not claim all GPIO types are wrong from EDIF's generic inout serialization. Eleven digital net logical endpoints remain corroborated by current U1 wire read; VDSTH divider R19/R20/C23 requires analog-context review, not an invented driver. No metadata changes or ERC suppression.
Completed with qualification — wheel removal audit: full schematic summary enumerates all110 components and all82 nets; only8 wire pads remain (battery2,motor3,servo3); no wheel pad components remain. R39,R40,C42 and queried J4 variants are absent. MCU PA15 is explicitly no-connect (also has a drawn unlabelled stub); no WHEEL signal connection remains. Both WHEEL_EXT and WHEEL_SPEED survive as zero-connection empty nets, so total removal is not fully clean. PCB net-filtered tree returns no layout items for these names. This does not independently exclude every unassigned decorative label/orphan historical object; full text/geometry sweep and original removal-thread report were not retrieved. Shared D1 and J3 remain: IO1/2/3 on HALL_A/B/C_EXT with R31/32/33 and J3 pins3/4/5; D1 pins3/5 and J3 pin2 GND; J3 pin1 5V; pin6 motor-temperature path. Hall physical routing remains incomplete as shown by airwires. No Hall circuitry deleted.
Completed as evidence review, repair blocked — CSS shunt/J6: prior exact-source/land-pattern work remains unresolved; did not repeat unsuccessful research. Current summary confirms R16/R17/R18 CSS4J Top90 at(-8.1,-6),(0,-6),(8.9,-6), body bounds6.5×10.06mm; not certified recommended lands. J6 stays fixed(8.77,4.5),270°, with reported bounds9.75×15mm not qualified physical body size. Historical Fab/Silk offset report remains valid concern and was already filed; no asset mutation. Full source drawing datums/sense-land geometry still need qualification.
Unattempted by instruction — routing, footprint/placement corrections and metadata edits: audit scope prohibits these. No failed routing loop restarted.
Bounded concrete repair plan for lead approval
Reconcile current no-mirror SVG with prior report; compare DRC/export on same snapshot before calling support an unavoidable continuing blocker. Verify potential C20 export net-label anomaly from literal bytes, as detailed in support report.
Independent nongeometric cleanup: approve deletion of the two truly empty wheel nets and stale wheel-speed project description; retrieve removal report/full text sweep before calling the interface exhaustively cleaned.
Source exact MPNs and voltage/power ratings for82 generic passives in focused batches; preserve package/current/voltage requirements. This is useful work independent of routing transforms, not82 arbitrary substitutions.
Obtain actual electrical pin metadata via an exposing API/editor/support; compare GPIO and VDSTH types to datasheets, then propose only demonstrated corrections.
Qualify exactCSS sense/force land geometry and J6 body-to-pad datum; repair assets only from authoritative dimensions, not by hiding warnings or moving fixed interfaces.
Once coordinate consistency and geometry are accepted, authorize one bounded local decoupler-return repair with readback/checks, then three force-current branches and B/C references. Stop if no progress; no guessed offset/clearance relaxation.
Address power-bank/decoupling placement, labels, remaining206 routing connections, current capacity and thermal validation before a readiness review. A peer review may be useful now for architectural risks, but cannot reasonably be described as only a few minor issues remaining.
This is a current resume artifact, not completion of the lead's overall design task.
Geometry/local-repair phase started — interrupted before mutations