Getting Started with Flux


Finished execution
"FC PCB Pre-Routing Blockers" completed.
Power trace widths ane via configuration sudharya chhe, pan USB breakout foreign copper thi blocked chhe ane 12 header-keepout errors baki chhe. USB ne unresolved rakhine baki nets nu routing attempt karish; stackup/checker ni inconsistency pan record kari chhe.
Aa session ma routing preparation sudhari ane fresh checks karya, pan routing complete nathi thayu.
  • 39 × 39mm board ane 80 components ni placement preserve kari. Power/GND trace widths configure karya ane via-drill configuration 0.25mm sathe consistent kari.
  • 153 airwires haju baki chhe. Autorouting attempt ACUs pura thata pause thayo; nava completed routes confirm nathi.
  • 12 keepout errors J2–J7 par baki chhe. Rendered header geometry ane checker na bounds vachche discrepancy mali—mounting reservations delete kari ke errors suppress kari nathi.
  • 10 ERC errors baki: 2 IMU supply-source detection ane 8 USB supply/ground-source findings. Connectivity inspection ma IMU supply connected chhe, pan clean ERC claim nathi.
  • USB routing blocked chhe: protected breakout mate feasible path malyo nahi; connector ane MCU na USB pins mate 3 unroutable-pair warnings chhe. Stackup nu reported total thickness pan layer-thickness sum sathe match nathi thatu.
Aagal jaruri: USB obstruction resolve karvu, header/checker ane stackup discrepancy reconcile karvi, pachhi routing ane fresh DRC. Original mounting notches, 4.9mm height fit, ESC access ane physical/55A testing haju unresolved chhe; aa session ma ESC par changes nathi karya. Platform discrepancies mate Contact Support jaruri chhe.
Board manufacturing ke flight mate ready nathi. Tamara ACUs pura thai gaya etle execution rokayu.

Waiting for input


Schematic of F405 Flight Controller Prototype
Schematic Not Placed

The schematic has not been placed. Flux can arrange symbols and draw wires to be more readable. This takes about 10–60 mins.

F405 Flight Controller Prototype