Getting Started with Flux


Thought for 13 mins 38 sec
Thought for 13 sec
1/3 Fresh checks ane stackup/keepout blockers sudharva

Fresh checks ane stackup/keepout blockers sudharva

FC routing ane final ERC/DRC verify karva

ESC access ane hardware-test limitations reconcile karva

Thought for 24 sec
Awaiting 1 task
"FC PCB Pre-Routing Blockers" completed.
Power trace widths ane via configuration sudharya chhe, pan USB breakout foreign copper thi blocked chhe ane 12 header-keepout errors baki chhe. USB ne unresolved rakhine baki nets nu routing attempt karish; stackup/checker ni inconsistency pan record kari chhe.
Aa session ma routing preparation sudhari ane fresh checks karya, pan routing complete nathi thayu.
  • 39 × 39mm board ane 80 components ni placement preserve kari. Power/GND trace widths configure karya ane via-drill configuration 0.25mm sathe consistent kari.
  • 153 airwires haju baki chhe. Autorouting attempt ACUs pura thata pause thayo; nava completed routes confirm nathi.
  • 12 keepout errors J2–J7 par baki chhe. Rendered header geometry ane checker na bounds vachche discrepancy mali—mounting reservations delete kari ke errors suppress kari nathi.
  • 10 ERC errors baki: 2 IMU supply-source detection ane 8 USB supply/ground-source findings. Connectivity inspection ma IMU supply connected chhe, pan clean ERC claim nathi.
  • USB routing blocked chhe: protected breakout mate feasible path malyo nahi; connector ane MCU na USB pins mate 3 unroutable-pair warnings chhe. Stackup nu reported total thickness pan layer-thickness sum sathe match nathi thatu.
Aagal jaruri: USB obstruction resolve karvu, header/checker ane stackup discrepancy reconcile karvi, pachhi routing ane fresh DRC. Original mounting notches, 4.9mm height fit, ESC access ane physical/55A testing haju unresolved chhe; aa session ma ESC par changes nathi karya. Platform discrepancies mate Contact Support jaruri chhe.
Board manufacturing ke flight mate ready nathi. Tamara ACUs pura thai gaya etle execution rokayu.

Waiting for input


Pre-routing readiness
Gate result
NOT READY for full autorouting or manufacturing. This scoped preparation batch is finished with unresolved items; it does not complete the overall design. No full autoroute or EM simulation was launched. Routed critical nets: none.
Fresh read-only DRC/Placement/ERC/Signal Integrity review timestamp: 2026-10-08T13:03:07.196Z. Live routing state: 153 airwires, zero redundant traces. Feasibility check before edits and after real preparation edits returned the same three USB differential-pair warnings (zero improvement); retries stopped.
Assigned item disposition

Table


ItemStatusEvidence / specific blocker
Inspect actual persisted board, requirements and checksCompleted80 components, 69 nets; placement and stackup inspected, authoritative core-power-budget consulted
Preserve approved board size and placementCompleted39 × 39mm rectangle and all component origins, rotations and sides retained; no components added, removed or moved
Correct/reaffirm stackup reference roles and consistent hole configurationCompleted for roles/configuration; thickness reconciliation failedExplicit custom stackup reapplied with two inner Ground Plane roles and 0.25mm drill configuration; reported aggregate thickness remains inconsistent
Clear header mounting-reservation checker errors without moving componentsFailed / blocked12 keepout Errors persist on J2–J7; pin-1-origin physical geometry clears reservations but checker proxy bounds disagree; no safe placement-preserving workaround identified
Configure current-appropriate power and GND widthsCompletedFive rulesets created; independent effective rule-source readback confirms seven net widths below
Protected USB-C breakoutFailedOne deterministic attempt returned no feasible geometry because foreign copper blocks every tie/Y/wraparound candidate; no copper produced
Deterministic fine-pitch neckdown passCompleted execution; no authored neckdownsTool generated 0 deterministic neckdowns; not a successful USB breakout substitute
Remove only genuinely redundant copperCompleted inspection; no deletion neededRouting-state inspection reported zero redundant traces; existing GND fill and three vias retained
Fresh verification and readiness recordCompletedFresh error/warning checks, rule-source readback and routing-state inspection performed
Full autorouteUnattempted, intentionallyReserved for lead; do not launch as a clean-ready board while USB pin-removal warnings persist
EM simulationUnattemptedNo routed critical nets exist
Changes made
  • Reapplied custom four-layer stackup, label JLCPCB SDI geometry - GND references; preserved the persisted physical copper/dielectric values rather than inventing vendor geometry.
  • Normalized hole configuration to 0.25mm drill/minimum, consistent with configured through-via drill; prior hole configuration had an inconsistent 0.55mm minimum. Via pad remains 0.55mm.
  • Created rulesets FC regulated input trunks, FC logic rail width, FC quiet IMU rail width, FC ground escape width, and FC data-only VBUS sensing width using exact net-UID selectors and important trace-width rules. The mutation emitted selector applicability warnings; subsequent read-only rule-source inspection verified that the requested widths are effective on the nets.

Table


Net(s)Effective trace widthBasis
EXT_5V_INPUT, EXT_5V_FUSED, CORE_5V0.30mmExisting budget: 180.16mA core allocation; external regulated 5V capability at least 250mA
3V30.25mm170mA logic allocation
3V3_IMU0.15mm10mA IMU engineering allocation
GND0.127mmFine-pitch escape minimum; bulk returns intended through filled GND and inner reference planes; connectedLayers = All
USB_VBUS0.15mmHost sensing/ESD only, approximately 41–48µA DC detection load, not core supply
The widths implement the existing external-5V-only architecture; there is no ESC motor-current or accessory-current allocation. This is routing preparation, not completed thermal/voltage-drop qualification of actual routed lengths.
No logical connectivity, component properties or approved component placement changed. Existing 17 Top / 63 Bottom arrangement retained. Eight Ø6mm Top/Bottom mounting reservations at (±15.25, ±15.25) were retained, preserving 30.5 × 30.5mm mounting-center spacing. No reservation was deleted and no Error was suppressed to force a green check.
Stackup readback and unresolved aggregate

Table


CopperRoleThickness
L1 Top CopperSignal0.035mm / 1oz
L2 Mid-Layer 1Ground Plane0.035mm / 1oz
L3 Mid-Layer 2Ground Plane0.035mm / 1oz
L4 Bottom CopperSignal0.035mm / 1oz
Dielectrics: 0.210mm FR-4 Dk4.4 / 1.065mm Core Dk4.6 / 0.210mm FR-4 Dk4.4. Outer solder masks: 0.025mm each, Dk4. Through-via L1–L4: 0.55mm pad / 0.25mm drill. Manufacturing selections remain Standard Density SDI v3 and JLCPCB SDI 4 Layer v1.
Physical copper + dielectric sum is 1.625mm; including masks it is 1.675mm. Readback still reports totalThickness = 1.55mm despite explicit reapply. Resolve platform aggregate metadata and obtain the actual fab stackup before claiming final thickness or qualified 90Ω USB impedance. The live inner-layer Ground Plane roles were already present at initial inspection, despite the older placement report; this batch reaffirmed them rather than proving a new role transition.
USB blocker
Protected breakout called on live J1 UID 0168a5e7-c867-4b64-8a01-769dfddabd45, pair USB_DP/USB_DM, 90Ω target and default geometry. Exact result:
no breakout copper was produced ... no feasible authored geometry: foreign copper blocks every tie/Y/wraparound candidate
After power-width and stackup preparation plus neckdown pass, the feasibility check still returned ROUTING_UNROUTABLE_DIFFERENTIAL_PAIR_PINS for:
  • J1 DP1 / DN2;
  • J1 DP2 / DN1;
  • U1 PA12 / PA11.
These are Warning-severity findings but the tool says the affected pins would be removed from their routed nets. Treat them as a routing gate, not harmless residual warnings. USB_DP and USB_DM each retain four airwires spanning connector ties, D2 USB protection and MCU. Do not substitute ordinary USB autorouting or repeat the identical failed breakout. Next work requires identification of the precise foreign-copper obstruction and a legal protected escape, or approval for an appropriate placement change; do not weaken manufacturing clearances or differential-pair requirements merely to pass.
Header geometry versus checker
61300611121 uses a normal pin-1 footprint datum: local pad X positions 0 through 12.7mm and courtyard X bounds approximately −1.67 through +14.37mm. Approved horizontal origins X=−6.35mm produce physically centered courtyard bounds approximately ±8.02mm; vertical headers analogously use Y=−6.35mm with rotation. Rendered pad/courtyard geometry clears the corner reservations, while the keepout checker appears to use an origin-centered proxy. The earlier documented footprint-container-offset workaround changed physical geometry and failed; it was not repeated. Moving these headers, deleting mounting zones or suppressing the findings would violate the placement-preserving intent. The 12 unresolved Errors must be reconciled with the platform geometry/checker, not represented as resolved mechanical clearance.
Fresh verification counts

Table


Category / findingSeverityCount
AirwiresError153
Header Keepout Violations, two each on J2–J7Error12
Missing Power, U2 VDD and VDDIO on 3V3_IMUError2
Undriven Nets, J1 power-type pinsError8
Board DensityWarning1
USB unroutable differential-pair pin groups, separate feasibility toolWarning3
Fresh DRC/Placement/ERC/Signal Integrity query returned no other findings. Focused inspection also returned no missing-footprint, invalid-layer/pad, component-overlap or redundant-trace findings. These results do not qualify unimplemented routes or proprietary firmware/interface compatibility.
The eight J1 ERC errors are GND, GND__1, four SHELL_GND pins on GND, and VBUS/VBUS__1 on USB_VBUS. Read-only schematic inspection confirms U2 VDD/VDDIO and U5 VOUT share 3V3_IMU, so that power-source detection is unresolved rather than an observed missing schematic wire. No library electrical types or source declarations were changed without validation, and the ten ERC Errors remain unsuppressed.
The 153 airwires cover power, IMU/flash SPI, USB, UART, motor signals, debug, ADC and clock nets; current routing-state list contains no GND airwires. Zero neckdowns and failed breakout mean no new signal copper was authored in this batch.
Remaining external gates
Exact Ø4mm side-open mounting notch geometry, screw/socket/cable fit, bottom-side component clearance, unequal-size ESC fit and the 4.9mm reference-height compatibility remain unqualified. The rectangular board and reservations are placeholders, not finished mounting holes or a qualified mechanical assembly. Stackup metadata reconciliation, header-checker reconciliation, USB protected escape and ten ERC Errors prevent a clean-ready handoff.
An internal-feedback submission concerning stackup/checker/breakout diagnostics failed; no report/ticket was filed. This record is the durable evidence for the lead's next actions.
  • Gate result

  • Assigned item disposition

  • Changes made

  • Stackup readback and unresolved aggregate

  • USB blocker

  • Header geometry versus checker

  • Fresh verification counts