Preliminary FMEA — Vitachrona MIPI Wearable
Scope
Draft system-level FMEA based on the current schematic architecture. Scores are placeholders until design requirements, claims, and prototype evidence are available.

Table


SubsystemFailure ModeEffectSeverityLikelihoodDetectionInitial Mitigation
LiPo chargingOvercharge / thermal runawayFire, burn, device damage10TBDTBDCharger config, protection IC, NTC, charge-current limits, certified cells, thermal testing.
Qi chargingCoil overheats or FOD failsSkin burn, enclosure damage9TBDTBDFOD tuning, temperature sensing, charging-state restrictions, thermal cutoff.
ECG AFELeakage or ESD path to patientShock, invalid ECG10TBDTBDInput protection, leakage analysis, applied-part safety design, charging disable policy.
Bioimpedance AFEExcess excitation currentPatient discomfort/injury, invalid measurement9TBDTBDHardware current limits, firmware limits, watchdog, single-fault testing.
LTE moduleTX burst brownout/noiseReset, missed data, corrupted measurement7TBDTBDDedicated power bulk caps, RF/analogue partitioning, duty-cycle aware firmware.
eSIMProvisioning/interface failureLoss of cellular connectivity5TBDTBDSIM interface validation, provisioning workflow, local data buffering.
DisplayIncorrect or missing warning displayUser misses critical state7TBDTBDFirmware watchdog, status LEDs/haptics if needed, display self-test.
MIPI/display powerEMI couples into ECG/PPGMeasurement artifact6TBDTBDControlled-impedance routing, ground returns, filtering, test during display activity.
Battery gaugeWrong SOC estimateUnexpected shutdown6TBDTBDGauge calibration, low-battery margin, brownout-safe shutdown.
Firmware/updateCorrupt firmware or bad updateDevice unavailable or unsafe state8TBDTBDSecure boot, rollback, watchdog, update verification.
Highest-Priority Actions
  1. Define claims and whether medical device controls apply.
  2. Decide charging/sensing/wearing policies.
  3. Complete power, thermal, and leakage analyses.
  4. Add datasheet support networks and protection before layout.
  • Scope

  • Highest-Priority Actions