Multi-PCB Build Register
Authority and scope
This register reconciles the uploaded nine-PCB architecture with the existing Flux project set. The RK3568 migration, audited imported parts, established 8-layer high-speed stackup, and 16-pin USB3 pogo dock override obsolete statements in the uploaded text. No MPN, connector geometry, memory mapping, or mechanical dimension may be guessed.
Authoritative board set

Table


Program PCBFlux projectStatus / disposition
PCB-001 Main compute/systemVitachrona MIPI WearableActive. RK3568 target; DDR and RK809-5 remain gated. J30 16-pin USB3 pogo is the production dock-side interface.
PCB-002 Medical sensorMainboard medical blocks plus sensor-link derivativesArchitecture must be partitioned after enclosure/electrode geometry is confirmed; do not assume every listed sensor belongs on one PCB.
PCB-003 AMOLED moduleRev.17 AMOLED Display PCB — DM-OLED14R-678NExisting 1.39-inch 454x454 project is the currently identified module. Uploaded 1.504-inch Fannal statement conflicts and is not authoritative without exact MPN/drawing.
PCB-004 Quartz moduleVitachrona Display Module C — Hybrid AnalogActive independent module; mechanical axis, motor/coil data and connector mating geometry are hard gates.
PCB-005 Power/harvestingWireless Charging Receiver Flex, Solar Ring, Distributed LiPo Cell Carrier, and mainboard harvesting blocksRetain as separate physical boards where already split. Uploaded STWLC38/AEM10941 choices do not silently replace existing audited designs.
PCB-006 RF/communicationMainboard RF plus separate LTE and GNSS antenna projectsBG95-M3, ST4SIM-300M, nRF5340, PN7160 remain authoritative. Antenna PCBs require enclosure-backed RF geometry.
PCB-007 Strap sensor linkVitachrona Sensor Link TemplateReusable base project; create one derivative per sensor payload rather than populating all sensors simultaneously.
PCB-008 Wireless ECGVitachrona ECG PatchActive separate wireless board.
PCB-009 Wireless EEGVitachrona EEG HeadpieceActive separate wireless board; medical safety review mandatory.
PCB-010 Production USB3 dockVitachrona Charging DockNew authoritative addition. Replace the legacy 4-pin USB2-only dock with a 16-pin USB3 pogo interface matching watch J30.
Non-negotiable gates
  • Do not wire RK3568 DRAM AC/DQ/DQS/ZQ or DDR rails until an authoritative Rockchip reference cross-table, verified LPDDR4X ball map, and exact RK809-5 OTP/rail assignment are independently confirmed.
  • Do not claim final USB3 pogo SI compliance without vendor pogo-module drawings/model and post-build TDR/USB compliance measurements.
  • Do not finalize antenna copper without enclosure, ground-plane, antenna-vendor, and RF matching data.
  • Do not finalize display/quartz/module outlines without exact mating drawings and stack-up datums.
  • Medical boards require patient-protection, leakage-current, electrode, and regulatory review; ordinary ERC/DRC is not sufficient.
  • The uploaded 38 mm circular target conflicts with the present staged RK3568/mainboard geometry and must be treated as a mechanical requirement to validate, not an achieved fact.
Build order
  1. Mainboard: finish all non-DDR schematic cleanup, power/interface validation, production connector definitions, and placement feasibility.
  2. Production USB3 dock: replace legacy interface, establish safe power role/protection, route what exact mechanics permit, and document SI/mechanical measurement gates.
  3. AMOLED and quartz removable modules: lock shared connector and mating geometry before routing.
  4. Wireless ECG and EEG: complete schematic safety review before PCB layout.
  5. Strap template and sensor derivatives: validate base interface, then build one payload per project.
  6. Harvesting/battery and RF antenna boards: advance only with exact mechanical and vendor data.
  7. Run board-specific ERC/DRC, bring-up, manufacturing, SI/RF/thermal, and medical/regulatory gates before release.
Status vocabulary
Every unresolved item is classified as PASS, WARNING, UNRESOLVED, MPN_REQUIRED, DATASHEET_REVIEW, REFERENCE_DESIGN_REVIEW, SIGNAL_INTEGRITY_REVIEW, RF_REVIEW, THERMAL_REVIEW, MECHANICAL_REVIEW, MANUFACTURING_REVIEW, or MEDICAL/REGULATORY_REVIEW.
  • Authority and scope

  • Authoritative board set

  • Non-negotiable gates

  • Build order

  • Status vocabulary