Chat


How can I help you?

Explain project
Write a project description
Find schematic issues

# Project Specification — Vitachrona Main Watch PCB ## Project Overview **Status: RK3568 migration authorized and staged non-destructively as U30/U31; destructive implementation remains BLOCKED by DDR library quality, exact topology, power and connector gates.** Production-intent medical wearable main board with Linux-class compute, LTE/GNSS, BLE hub, NFC, sensing, wireless charging and harvesting in a preserved 98 mm circular envelope. ## Hard retained subsystems Exactly retain ST4SIM-300M, nRF5340 hub, PN7160, Qi/BQ25895, harvesting interfaces, AD5940, main-board sensors, eMMC, BG95M3LA-64-SGNS and the 40-pin MIPI display interface. BG95 debug remains on an independent native USB2 path. ## Authoritative compute direction - RK3568, Flux UID `111e7434-7f63-4f64-9fe8-9ab643a6378e`. - RK809-5 direction, UID `eeac72e7-5a15-422a-9419-94a00f7c7455`. - U30 RK3568 and U31 RK809-5 are present in the `RK3568 Migration Staging` Functional Group. They are intentionally not connected to provisional rails/signals until the source-backed DDR and PMIC maps close. - x32 LPDDR4/LPDDR4X 200-ball topology. Samsung K4F6E3S4HM-MGCJ is audited as an LPDDR4 candidate but is not releaseable because its library terminal types are unspecified and complete coordinate/topology reconciliation remains open. - Retain MTFC16GAPALBH-IT eMMC after current/pin audit closure. ## Dock architecture The board now includes staged custom component **J30 / VITACHRONA-DOCK-USB3X-16**, a keyed 16-contact watch-side target-pad interface. This is a bespoke interface and not a USB connector standards claim. Contact order, left-to-right when viewing the watch PCB Top face with the asymmetric key holes below the contact row, is: | Pin | Function | Pin | Function | |---:|---|---:|---| | 1 | SHIELD_A | 9 | USB2_DP | | 2 | GND_TX_A | 10 | USB2_DM | | 3 | SSTX_P | 11 | GND_PWR | | 4 | SSTX_N | 12 | VBUS_A | | 5 | GND_TX_RX | 13 | VBUS_B | | 6 | SSRX_P | 14 | DOCK_DETECT | | 7 | SSRX_N | 15 | DOCK_ID | | 8 | GND_RX_USB2 | 16 | SHIELD_B | Electrical allocation carries: 1. VBUS 2. At least two ground/return contacts 3. USB2 D+/D- connected to the RK3568 OTG device path for Rockusb/Maskrom recovery/programming 4. USB3 SSTX+/-, SSRX+/- for normal data 5. Dock detect/orientation/keying contact where applicable No exact suitable built-in connector was available. The sourced technology direction is a **Johoty custom impedance-controlled high-speed pogo module**: the manufacturer advertises >10 Gbps designs, DC-to-10 GHz customization, 1–2 A standard contacts, <=20 mOhm initial contact resistance, and custom 50/90/100-ohm structures. Mill-Max guidance supports spring travel, pad mating, alignment tolerance and multi-cycle durability but does not itself establish USB 3.x bandwidth; Smiths Interconnect is a qualified alternate custom spring-probe supplier for blind-mate/high-frequency mixed-signal assemblies. J30 footprint datum is the center of the 16-land Top-face row. Lands are at 1.0 mm pitch from x=-7.5 to +7.5 mm; USB signal lands are 0.55 x 1.40 mm, grounds 0.60 x 1.60 mm, VBUS 0.75 x 1.80 mm, and shields 0.70 x 1.80 mm. Two unbound NPTH features key and retain the dock: round 1.2 mm hole at (-6.0,-2.5) mm and oblong 2.0 x 1.2 mm slot at (+6.5,-2.5) mm. Dock probes approach normal to the PCB Top face; the asymmetric round/slot pattern prevents 180-degree reversal. Gold finish, solder-mask opening, probe crown, working stroke, force, housing datums and enclosure retention remain vendor/prototype deliverables. USB requirements: - Dock USB2: 90 ohm differential. - Dock USB3 TX/RX: 85 ohm differential. - Low-capacitance SuperSpeed ESD candidate: TPD4EUSB30; addition waits for real endpoints to avoid orphan nets. - VBUS protection/load switch waits for confirmed source role/current/inrush contract. - VBUS_A and VBUS_B are paralleled on `DOCK_VBUS_5V`; architecture limit is provisionally 2 A total (1 A/contact) until the selected custom module is thermally/current validated. - USB3 TX AC coupling must follow the final authoritative RK3568 reference topology. - BG95 native USB2 debug remains independent and 90 ohm differential. ## IOMUX/VCCIO release rule Dedicated RK3568 eMMC, USB and DSI balls are identified, but retained low-speed assignments are not wired until a complete authoritative IOMUX/VCCIO table proves each bank voltage and alternate function. `FLASH_VOL_SEL` must match VCCIO2 (3.3 V low, 1.8 V high). ## Non-destructive migration rule Do not remove the preserved legacy compute, FlexSPI/NOR/PSRAM, FT600/SuperSpeed or SARA-substitution circuitry until the RK3568/RK809/DRAM/eMMC block passes part audits, is staged with source-backed power/clocks/reset/boot/DRAM/eMMC/decoupling, retained interfaces are reconnected, and ERC validates replacement connectivity. ## Physical implementation - Preserve 98 mm circular board boundary. - Stackup is now an 8-copper-layer electrical plan: signal / GND / signal / power / GND / signal / GND / signal. - Final fabrication requires approved HDI build-up, laser microvias, sequential lamination, filled/capped via-in-pad, and field-solver/coupon-derived DDR/USB/MIPI geometries. - No routing is authorized yet. - Schematic net metadata now declares dock and BG95 USB2 pairs as 90-ohm differential and dock USB3 TX/RX as 85-ohm differential. Final widths/gaps require a fabricator field solver and coupons. ## Current audit and ERC evidence - RK3568: 636 terminals/636 pads; source package 19 x 19 mm, 0.65 mm; full coordinate audit incomplete. - RK809-5: 69 terminals/69 pads; QFN68 7 x 7 mm, 0.35 mm, grounded EP; exact rail/OTP mapping incomplete. - Samsung LPDDR4: 200 terminals/200 pads; 10 x 15 mm mixed 0.65/0.80 mm grid; terminal typing fails release gate. - Chosen migration-memory direction remains Samsung **K4F6E3S4HM-MGCJ** LPDDR4 x32; it is selected for the migration plan but not layout/release qualified until terminal typing and the complete RK3568 ball/topology cross-table close. - J30 custom dock: 16 terminals; 16 distinct Top copper lands plus 2 asymmetric NPTH key/mount features. It is staged and schematically connected to RK3568 OTG USB2/USB3, ID, detect, VBUS-detect, GND and SHIELD nets; PCB placement/routing is intentionally not performed. - Fresh pre-change ERC: **755 = 619 floating + 105 missing-power + 31 single-pin nets**. - Post-staging checks were rerun. The project remains unreleased with extensive pre-existing ERC/DRC findings; U30/U31 are intentionally isolated staging components, not a claimed functional core. ## Release criteria 1. Complete core terminal/ball/pad coordinate audits against authoritative drawings. 2. Correctly typed, exact DRAM library part and source-backed RK3568 LPDDR topology. 3. Exact RK809-5 rail map, sequencing and support components with closed current/headroom budget. 4. Authoritative retained-interface IOMUX/VCCIO allocation. 5. Verified keyed 12-contact dock connector and VBUS contract. 6. Replacement core staged and ERC-validated before legacy deletion. 7. Final HDI stackup and impedance geometry approved by fabricator/field solver before routing. 8. Build and measure mating prototypes: contact-force/overtravel/tolerance stack, VBUS temperature rise and droop, TDR/S-parameters, USB eye/BER, ESD and USB compliance. J30 must not be called production-qualified before these pass.
  • Project Overview

  • Hard retained subsystems

  • Authoritative compute direction

  • Dock architecture

  • IOMUX/VCCIO release rule

  • Non-destructive migration rule

  • Physical implementation

  • Current audit and ERC evidence

  • Release criteria