I saved your hardware inventory and deliverables in Recording System Requirements, including the corrected timing: 5 minutes idle + 2 minutes recording = a 7-minute cycle.
The design has not been built yet. No schematic, PCB, firmware, or KiCad ZIP has been generated.
Before design work, I need these details:
- Does “recording” mean audio saved to a microSD card? Should environmental readings be saved too?
- Should the PCB accept your existing modules, or replace them with integrated components?
- Is the temperature sensor a DS18B20? You listed “DS1820B.”
- Should the battery recharge through USB, and must recording continue while charging?
Verified component research, PCB design, firmware development, and export checks need Agent mode. Execution stopped because your account ran out of ACUs.
What is Agent mode?
Agent mode lets Flux build, do deep research, validate designs, and work through complex assignments.
Chat mode is just as smart and has the same engineering knowledge, but it cannot work autonomously.
Only Agent mode consumes your plan's included AI usage (measured in ACUs).