ต่อ PSU ใช้วินช์
Project Specification
Design Notes
24 V × 280 A = 6,720 WSafety Analysis
Preliminary FMEA
Talk to Flux to get started.
Prerequisites
1. Unpowered inspection
2. Protective earth and isolation gate
3. Individual PSU test
4. Single 24 V string test
5. Two-string parallel test
6. Fault tests
7. Winch connection
Pass criteria