Fix GND Airwire


flux

I’ll recover the saved repair state, finish the electrical safety fixes, then complete placement and routing where the design is qualified. I’ll retain the existing ESP32-S3 boards and SPI motor interfaces, and keep any unresolved motor-power limits explicit.
"ESP32-S3 Carrier Expansion Feasibility" completed.

flux

I repaired the ADC bus pull-ups, sourced the remaining isolation support parts, and added the first motor’s interlock circuitry. The second interlock and signal-contention checks are still incomplete, so I’m finishing those before moving the new hardware onto the PCB.
"ESP32-S3 Carrier Expansion Feasibility" completed.
In carrier-work: delete the existing H1 and H2 headers. Add H1 (2x18), H2 (2x18) and H3 (2x12), omitting pin 1 on each for keying. Rewire all existing header nets onto the matching pins of the new headers using the pin map: H1/H2 pins 1-6 power, 7-10 lighting, 11-14 high-side, 15-18 triggers, 19-24 CAN (two channels), 25-26 I2C, 27-28 spares, 29 nRST, 30-36 GND. Commit "headers".

flux

I’ll treat this as a separate header change in carrier-work, leaving the current safety review undisturbed. Before deleting headers, I need the exact net-to-pin assignments: the ranges don’t distinguish individual power rails, signals, or the two CAN channels, and H3 has no mapping yet.

Waiting for input


Analog Expansion Checkpoint
Scope and item dispositions — 2026-10-10
  • Completed: eight functional analog signal chains, four per local MCU domain; U12/U13 ADS1115, U14/U15 TMUX1511, J46–J49, R105–R128, C32–C43 installed and wired. All 132 introduced floating pins resolved; independent readback covered all 44 components and all 24 new analog nets.
  • Completed: passive DC/AC/transient/corner simulation and documentation. These are idealized passive results, not active-device or fault qualification.
  • Failed to complete: analog protection qualification. Charged ADC capacitors can exceed VDD+0.3 V during fast rail collapse; supply-ramp behavior, negative inputs, continuous overvoltage, connector ESD, ADC loading/leakage, full-temperature limits and power budget remain open. This is an unfinished schematic, not release approval.
  • Failed to complete: schematic ERC repair: 30 U5/U6 Undriven Nets Errors and six diode terminal-metadata Warnings remain. No suppression or circuitry-changing workaround applied.
  • Failed to complete: exact TMC5160T Pro V1.0 socket/control and motor-power interface. Exact mating geometry, logic/SD_MODE and bounded current/regeneration envelope remain unresolved; no motor parts installed.
  • Unattempted by design: PCB placement, routing, outline, stackup, copper and exports. Existing PCB untouched.
Installed architecture supersedes earlier selector/buffer proposal
Each domain has one ADS1115 at local address0x48 and one TMUX1511. ADDR=GND, ALERT/RDY=NC; switches and SEL1–4 use the same local3.3 V as their ADC. No MCU GPIO consumed. Separate I2C buses remain separate. No OPA buffer, LM4040 clamp rail or hardware range selectors installed.
Each channel: connector →4.53 kΩ →DIV; DIV→1 kΩ→GND; DIV→TMUX→ADC; ADC→100 kΩ→GND and100 nF→GND. Upper/lower resistors0.1%, downstream pulldowns1%; all0603/0.1 W. Capacitors100 nF/25 V/0603; capacitor tolerance and biased/temperature capacitance not yet selected. Each ADC/switch has100 nF bypass. ADC input source resistance is approximately812 Ω in the ideal connected model, so the previous several-kΩ divider/buffer proposal is withdrawn.
J46=A1/A2, J47=A3/A4, J48=B1/B2, J49=B3/B4. On each three-pin terminal:1=odd channel,2=GND,3=even channel. Production MPNs for newly added passives remain open. Active current budgets and source spare capacity must be updated before completion.
Operating boundary and shutdown blocker
Only clean, shared-ground, unipolar0–10 V laboratory signals are contemplated. No raw automotive12/24 V, negative, floating-ground or unqualified ESD sources. Until power-collapse protection is repaired and qualified, disconnect input sources before any supply transition; do not hot-plug. Powered-off isolation does not independently prove safe rail ramp or discharge. ADS input absolute limits were researched as−0.3 to VDD+0.3 V.
The passive OFF simulation starts C32 at1.82 V, disconnects DIV and uses101 kΩ to ground: time constant10.1 ms;69.768 ms to0.1% without injected leakage. The ADC capacitor can remain charged while its rail falls. Static leakage equilibrium does not remove this stored-charge hazard. Do not treat selecting a smaller pulldown, adding an unqualified diode or the TMUX datasheet isolation statement as a completed remedy.
Firmware range plan
Select range independently in software. Use PGA±1.024 V for nominal0–3.3/0–5 V ranges and±2.048 V for0–10 V. Read single-ended AIN0–3, reject negative/out-of-range/timeout readings, and apply channel calibration. No jumper-selection behavior exists. Nominal input conversion is ADC volts/0.179363; that gain excludes actual switch resistance, ADC loading and sensor source resistance. Begin local I2C at100 kHz; reserve0x48 in addition to PCA9536 at0x41. No motor init applies.
Passive simulation evidence
Native simulation completed with exact R105=4530 Ω, R109=1000 Ω, R113=100000 Ω, C32=100 nF; ideal TMUX short when ON and open when OFF; ADC represented as open circuit. No vendor models, sampling, charge injection, supply ramps, clamp or ESD model.

Table


MetricResult
Nominal gain0.179363 V/V
ADC endpoints for3.3/5/10 V0.591896/0.896813/1.793625 V
Resistor-corner gain, ideal source0.179055–0.179670
Extra10 Ω source gain loss0.1808%
Pole1.95884 kHz
0.1% step settling561.76 µs; capacitor tolerance excluded
10 V DC power: top/bottom/pulldown14.8664 mW/3.21709 mW/32.1709 µW
Hypothetical OFF±2 µA with101 kΩ±202 mV equilibrium; not actual qualified leakage behavior
Resistor gain error alone exceeds0.1%; settling is not measurement accuracy. Pulse ratings, source impedance allowance, calibration and ADC acquisition remain qualification work. Simulation response was truncated before artifact URLs; no download or plot link is claimed.
Review evidence and remaining ERC
Fresh targeted ERC/passive/schematic review timestamp2026-10-10T06:13:46.752Z:30 Errors, all U5/U6 undriven input/power pins;6 Warnings, unspecified terminal types on D5/D11/D25–D28. No additional analog findings reported. Independent readback of all analog IN/DIV/ADC nets confirms intended two/three/four-pin memberships. Component/property readback verified44 new parts; metadata cursor failed twice, replaced by explicit net read.
Representative U5 control net contains series resistor, pulldown and U5 input; SEL0 has its pulldown; power net contains connector, capacitors, TVS and all seven supply terminals. This suggests drive-propagation/source metadata semantics, but is not a completed diagnosis and does not clear Errors. Terminal-level diode metadata also remains unresolved. Earlier zero-error checkpoints are historical and do not override this review. No full PCB DRC performed for the added unplaced circuitry.
Counts expected from199/122 baseline plus70 parts/32 nets:269 components/154 nets, consistent with current project context. Schematic batch completion is separate from overall expansion and board release.
  • Scope and item dispositions — 2026-10-10

  • Installed architecture supersedes earlier selector/buffer proposal

  • Operating boundary and shutdown blocker

  • Firmware range plan

  • Passive simulation evidence

  • Review evidence and remaining ERC