RF Triggered 12V Pulse


Built the complete receiver schematic: A23 battery, 868 MHz E22/SX1262 radio, ATtiny1614, switched 4700 µF pulse reservoir, and 12 V/1 A horn driver. ERC is clean; requirements and calculations are saved in Project Specification and Power Analysis.
Open item
  • The TPS70933 library part has incorrect footprint pin mapping and must be replaced or corrected before PCB fabrication.
  • PCB placement/routing and real-horn pulse/range testing remain.
  • Further execution stopped because no ACUs were available.
Next: replace the LDO with a footprint-verified equivalent, recheck ERC, then proceed to PCB placement.
I’ll inspect the current PCB for board setup, placement quality, airwires, and routing status, then automatically place and/or route only what is needed and verify the result.
The PCB needs both: it is still on the oversized default 160 × 100 mm outline with scattered placement, and it has 44 airwires plus one copper overlap. I’ll compact and functionally place it first, then clean stale copper and auto-route it with wider horn-pulse power paths.
Auto-layout is applied: the board is now 50 × 80 mm, two-layer, fully placed, and routed with reinforced pulse-current paths. I’m running an independent final DRC and visual layout check now.
Auto-layout applied: the PCB is now 50 × 80 mm, 2-layer, with all 26 components top-mounted and 225 routed segments / 16 vias. Final checks show 0 airwires, overlaps, dangling traces, invalid layers, or out-of-board components; 1 A horn pulse paths use 1.0 mm traces.
  • Open item: generic/header parts still lack manufacturer part numbers.
  • Next: review silkscreen, validate the horn pulse thermally/electrically, then export manufacturing files.
Fix BOM, review, export
Fix missing MPNs
Review silkscreen
Validate pulse paths
Export manufacturing files

Power Analysis
Required Output Energy
The specified output is 12 V at 1 A for 10 ms:
  • Load power: 12 W
  • Pulse energy: 0.12 J
Battery Strategy
An A23/23A 12 V alkaline cell is inexpensive and compact, but its internal resistance prevents it from directly maintaining a 1 A load. The design therefore stores pulse energy in an electrolytic capacitor. The capacitor remains disconnected during standby to avoid leakage current consuming the battery.
Storage Capacitor
For a constant-current approximation:
C = I x dt / dV
  • 4700 uF: about 2.13 V droop at 1 A for 10 ms.
  • 6800 uF: about 1.47 V droop at 1 A for 10 ms.
A 4700 uF/16 V part is the provisional cost/size choice. The design should allow 6800 uF if horn testing requires less droop. ESR must be low enough that the initial I x ESR drop remains acceptable.
Charge Path
A switched high-side path and approximately 100 ohm resistor limits initial charge current to around 120 mA at 12 V. Five RC time constants for 4700 uF are about 2.35 seconds; battery resistance will increase this. Firmware should allow roughly 3-5 seconds before firing and may optionally verify capacitor voltage with an ADC divider.
Standby Budget
Target battery current:

Table


ConsumerTarget average
12 V to 3.3 V regulator IQ3-4 uA
MCU deep sleepabout 1 uA
RF receive-duty-cycle average4-8 uA
Dividers/leakage/margin2 uA
Total target10-15 uA
At 55 mAh nominal capacity, ideal runtime is about 153-229 days. Applying capacity, temperature, self-discharge, and pulse-current derating gives a practical planning target of approximately 3-5 months.
Pulse Current Path
The horn switch and connector should be rated for at least 2 A peak. Use a logic-level N-MOSFET with at least 30 V VDS rating and low RDS(on) at 2.5-3.3 V gate drive. Use wide PCB copper for the capacitor-to-load loop. An inductive horn requires a transient clamp selected to protect the MOSFET without excessively extending the pulse.
Verification Required
  • Measure actual A23 charge time with the selected battery brand.
  • Measure capacitor ESR and voltage immediately before and after the pulse.
  • Confirm horn current waveform and acoustic output at 10 ms.
  • Measure real duty-cycled RF average current and packet acquisition probability over temperature.
  • Conduct range testing with the final antenna and transmitter settings.
  • Required Output Energy

  • Battery Strategy

  • Storage Capacitor

  • Charge Path

  • Standby Budget

  • Pulse Current Path

  • Verification Required