Device Proximity Alert System
Record the approved concept and derive provisional mechanical constraints.
Build and check the enclosure, bracket and internal placeholders.
Capture prototype electronics and firmware starter, then review remaining gaps.
Waiting for input
Talk to Flux to get started.
enclosure-concept; asset URLs, known defects and resume state are in mechanical-build-report. Execution was interrupted by ACU exhaustion.mechanical-build-report before any fabrication.Hard Functional Constraints
Proposed User Experience and Packaging
Sketch Instructions
Approval Gate
Mechanical Design Constraints — First Candidate