Project Startup Help


The TX/RX split tasks are still running longer than the wait window. I’ll check their status and report where they stand.
Both split tasks are actively working: TX is pruning RX-only circuitry; RX is pruning TX-only circuitry and replacing the XLR. I’ll give them one more wait window before reporting final status.
They’re still running. I’ll check final status once more and then give you the project links and current state so you’re not blocked waiting.
Created two separate PCB projects and started the split/place work in each:
Current status:
  • TX clone: RX circuitry removed, board-mounted XLR replaced with compact XLR harness pads, 25 × 80 mm / 4-layer target set, placement still running.
  • RX clone: TX circuitry removed, board-mounted XLR replaced with compact XLR harness pads, 25 mm width / 4-layer target set, placement still running.
  • Master project remains unchanged as the system/reference design.
Open item:
  • Both split-placement tasks are still running; they exceeded the wait window but are actively working on non-RF placement and verification.
Next step:
  • Open each project link later to review the completed thread result, or ask me to check their status again.
Check split projects
Check TX status
Check RX status
Fix failed split tasks
Compare split BOMs

Munkrofon

Munkrofon thumbnail