I’ll inspect the KiCad schematic, library table, and wiring notes, then check whether the schematic’s actual connections resolve the previous power faults.
The schematic is now an empty KiCad-format seed, with no components or wires—it does not implement or verify the accompanying instructions. Do not build from the wiring notes: they connect one charger BAT pin to ground instead of battery positive, connect the regulator’s L2 switching node to VOUT, and propose feeding the processor from the unregulated charger output.
The notes also retain the incorrect claim that wake-word listening requires the speaker amplifier to remain on; I made no project changes, and a real, datasheet-backed power schematic is still the next required step.
I’ll compare these three files with the previous set and check whether the power instructions are corrected and the schematic contains actual circuitry.
The notes correct the battery-positive connections, separate processor power from the charger output, and allow amplifier shutdown during listening—but the schematic and library table are unchanged, and the schematic is still empty. The notes remain unsafe to build from: they label the amplifier “8-pin” while assigning pins through 16, and incorrectly permit the charger’s TS input to be grounded or disconnected; TI specifies an NTC network, or a 10 kΩ resistor to ground when temperature monitoring is intentionally omitted.
I made no project changes; the next step remains a populated, verified power schematic—not fabrication.
The authorized 130 × 65 × 26 mm PROVISIONAL enclosure is now authored, uploaded and placed: base, front shell, revised existing PCB placeholder, battery allowance, six lid screws and two PCB retention screws. All 12 model nodes were read back enabled under ROOT, at unit scale, Z-up, with physical materials and visible edges. No electronics were added.
Delivery is not yet accepted as complete. Final installed geometry passed all 66 pairwise STEP checks after allowing intentional self-tapping thread interference, but the last sampled battery installation path collided with the base. This is an assembly-path failure of the tested trajectory, not proof that no trajectory exists. A collision-free insertion/removal path remains to be demonstrated. Execution stopped because ACUs ran out.
Assigned scope status
Table
Item
Status
Evidence / remaining issue
Read previous documents, concept and mechanical procedures
Completed
Existing brief/status and provided concept reviewed; mechanical standards v8.3 applied
Revised depth and preserved plan/silhouette
Completed, PROVISIONAL
STEP bounds 65 X × 130 Y × 26 Z mm; radius 6.5 mm rounded rectangle
Base, cavity, floor and side openings
Completed
Compiled one solid; thickness probes and through-cut checks passed
Front shell, front openings, stepped joint and shadow line
Completed
Compiled one solid; all 44 front through-cut probes passed; no base/lid overlap
PCB retention/supports and placeholder
Completed
Two retention screws, two locators, four auxiliary contacts; eight measured underside bearing faces
Battery allowance in installed position
Completed
50 × 90 × 6.5 mm; zero base overlap, intended floor contact
Battery installation/removal
Failed tested trajectory; unresolved
Sampled tilt/translation path intersects base; alternate paths not tested
Separate hardware upload/placement
Completed
Eight enabled screw nodes, sharing one source asset
Read-back and assembled render
Completed
12/12 nodes shown; final render displays front, right power opening and bottom USB opening
Installed STEP pair/clearance checks
Completed
66 pairs, no unintended installed overlap; detailed results linked below
Physical printing, fit, torque, durability and real component validation
Unattempted
Requires printer calibration and selected components
Overall first-pass acceptance
Incomplete
Battery installation path unresolved; do not claim ready to print/assemble
Final assets and nodes
These are the exact final project asset names and durable URLs. Superseded versions were removed automatically; history preserves them.
Table
Asset
Enabled node
Source
hermes-base-final.build123d
Enclosure base v3
3D Model
hermes-lid-fit.build123d
Front shell v2
3D Model
hermes-pcb-placeholder-repaired.build123d
PCB placeholder v2
3D Model
hermes-battery-envelope.build123d
Battery allowance v1
3D Model
hermes-st22x95-screw.build123d
Eight separate screw nodes listed below
3D Model
Base uses gray plastic #9a9a9a; front uses black plastic #1c1c1c; hardware uses bright steel #d0d5db. Battery and PCB are gray fit-check placeholders, not selected physical materials/cells or a routed board. Each separable item remains a separate model node; no screw is fused into plastic.
Coordinate and dimensional record
All values in mm. X is width, +Y is the product top, +Z is the front. PCB top remains Z=0; PCB bottom=-1.6. Base, lid, battery and PCB nodes all have position (0,0,0), rotation (0,0,0), scale (1,1,1). Hardware transforms are below. ROOT parent, enabled state, physicalMaterials=true and showEdges=true were read back for every node.
Table
Quantity
Value / evidence
Assembled outside bounds
X ±32.5, Y ±65, Z -14.6 to +11.4; measured 65 × 130 × 26
3.0 / 2.4 / 2.4; measured by independent STEP material probes
Exterior corner radius / edge treatment
6.5 radius; 0.4 mm 45° rear/front outer edge chamfers
Joint
Seam Z=6; base inner lip to Z=9; 3 mm engagement; measured lip 1.5, skirt 1.3, nominal 0.2 radial gap
Shadow line
Base radial recess 0.5 × height 0.5 immediately below seam
Board
54 × 112 × 1.6; four original Ø2.4 holes at (±23,±52) preserved
Focused board repair
Two 1.8 mm-deep × 8 mm-long side reliefs centered at Y=0, X=±27 edges; required for mid-perimeter lid bosses. No duplicate PCB node
Battery
X ±25, Y ±45, Z -12.2 to -5.7; 6.5 thickness; rests directly on floor
Top components
Z 0…7; ordinary roof clearance 2.0, verified for allowance with mechanical keepouts
Bottom components
Z -3.6…-1.6; battery separation 2.1; ordinary floor separation 8.6
PCB/battery separation
4.1 measured minimum
Depth derivation: 2.4 floor + 6.5 battery + 2.1 gap + 2 bottom allowance + 1.6 board + 7 top allowance + 2 top gap + 2.4 roof = 26.0. This is an envelope prototype, not a validated live-cell package. It adds no quantified swelling, adhesive, insulating liner or cable allowance. Do not install a real cell until its drawing and protection/mounting requirements are resolved.
Openings — all PROVISIONAL/Estimated
Table
Feature
Position
Geometry
Display visible window
Front, center (0,24)
48 × 60, corner R2
Push-to-talk
Front, center (0,-29)
Ø26
Privacy/status
Front, (23,59)
Ø2
Microphones
Front, (-9,59), (9,59)
Two Ø1.5
Speaker
Front, X=-18…18 at 3 pitch; Y=-51,-54,-57
39 Ø1.5 holes, 1.5 minimum webs
USB-C
Bottom wall -Y, X=0, Z=1.75
10.5 × 5, R1.2; nominal 10 × 4.5 plus 0.25/side
Power/multifunction
Right wall +X, Y=23, Z=2
8 along Y × 4 along Z, R1
Independent shrunken through-cut probes found zero remaining material in all 44 front cuts and both wall cuts. Final assembled render showed side and USB openings. An Estimated internal USB body box 12 × 5 × 6, centered (0,-59,2), has zero base overlap and 0.5 minimum base clearance. No selected connector, overmold, display body, actuator cap/travel, speaker, microphone assembly, light pipe or flex cable has been validated. Openings are intentionally empty; no unsupported extra controls, vents, logos, cellular or camera features were added. Actual plug insertion, finger actuation and wiring remain unverified.
Retention, supports and hardware
Two PCB screws follow the user's explicit two-screw target, overriding the generic >100 mm board three-screw target. Screw locations are (-23,-52) and (23,52), head seating plane Z=0. The other original corner holes use locators: round at (-23,52), relieved round at (23,-52). Locator nominal diameter 2.2, projection 0.5 above PCB, 0.25 tip chamfer; secondary has 0.1 relief each side along the locator diagonal.
Four additional underside contacts at (±26,±17) are wall-connected shelves above the battery. Eight coplanar support faces were measured at Z=-1.6. Auxiliary contact diameter is 2 mm after 0.5 chamfer on 3 mm bodies. Corner support center spacing is 46 across X; auxiliary bearing-edge clear span is 50; longitudinal contact center gaps are 35,34,35. All support landing and component-free zones are PROVISIONAL constraints on later layout, not verified real-board keepouts. Corner support roots include 2 mm fillets and tapered transitions; auxiliary shelves require accessible support during printing.
Hardware: 8 × nominal ST2.2 × 9.5 pan-head self-tapping screws, simplified major-diameter shank and tapered point, cross recess, no helical threads. Modeled head Ø4.2 × 1.8, 2 mm point, steel. Library search found no exact part. CELO DIN7981 web-search data supported these nominal envelope values; immutable datasheet citation extraction was still pending when execution stopped, so exact purchased-hardware conformity remains UNVERIFIED. Source for continuation: https://celopim.com/global-master/documents/tds/tds_din_7981.pdf . No actual fastener SKU or PETG torque/pilot qualification is selected.
Table
Exact screw node
Installed position (X,Y,Z)
Lid screw lowerleft v1
(-27.5,-59.8,9.5)
Lid screw lowerright v1
(27.5,-59.8,9.5)
Lid screw midleft v1
(-28.8,0,9.5)
Lid screw midright v1
(28.8,0,9.5)
Lid screw upperleft v1
(-27.5,59.8,9.5)
Lid screw upperright v1
(27.5,59.8,9.5)
PCB screw lowerleft v1
(-23,-52,0)
PCB screw upperright v1
(23,52,0)
All screw rotations zero; unit scale. Six perimeter lid screws give side station spacing approximately 59.81 mm and end spacing 55 mm. Lid seats are Z=9.5; heads end at 11.3, 0.1 below adjacent front. Counterbores Ø4.7; through-clearance Ø2.7; inward pad bottom Z=7.5 leaves 2 mm seating thickness. Mid-seat exterior rim nominal 1.35 mm. Driver probe Ø4.4 from Z=9.6 upward had zero plastic overlap and 0.1 mm minimum distance; PCB driver probes clear base with lid removed.
Fallback pilot Ø1.75: PCB bore from -10.5 to -1.6, leaving 1.7 mm above cavity floor and 1 mm nominal tip gap. Lid bore from -1.1 to 7.5, leaving 11.1 above floor and 1.1 nominal tip gap. Nominal engagement excluding the modeled 2 mm point: PCB 5.9, lid 5.5. Bore depths/tip stack are source-derived; detailed physical thread engagement, bottoming and torque are not qualified. Pilot intersections with simplified full-diameter shanks are intentional and explicitly excluded from interference failures.
Measured using pipeline-generated STEP downloads of the placed versions, with actual .fluxscene transforms. Numerical comparison: 0.01 mm distance tolerance and 1e-5 mm³ unintended overlap threshold, not manufacturing tolerances. All final STEP bodies valid. Base volume 44267.0351 mm³ (177 faces); lid 13297.0392 (108 faces); PCB 9601.7671 (18 faces); battery 29250 (6 faces); each screw 53.2267 (20 faces). Each asset contains one solid.
Final installed base/lid, base/PCB, base/battery: minimum distance 0 (intended contact), overlap 0. All 66 pair checks passed after classifying screw/pilot overlap as intentional. Top allowance-to-lid distance 2.0 with mechanical keepouts. Bottom allowance-to-battery distance 2.1. Allowance-to-base minimums were 1.6 top and 1.2328 bottom near mechanical features; these are not ordinary vertical floor/roof gaps. Reserved validation keepouts: radius 5 around four PCB corner mounting positions for top electronics; radius 5.5 around six lid screw axes; bottom radius 4.8 around eight underside supports, plus radius 5.5 around mid-lid screw axes. Later layout must use actual component boundaries and keepouts rather than fill every allowance corner.
PCB vertical removal samples at +0,+1,+3,+6,+10,+20 mm and lid removal at +0,+1,+3,+6,+10 mm gave zero base overlap. These are sampled path checks, not exhaustive swept-volume qualification. The final render and node tree confirm the parts are aligned at realistic scale. Browser user interaction itself was not exercised. Electrical DRC/ERC did not run and is not an applicable enclosure-fit gate.
Blocking battery assembly-path result
The installed battery position is collision-free. However, a tested path lowering a 30° tilted cell, then rotating flat while translating left, failed: first nonzero overlap at 23° (0.0185 mm³), maximum about 14.2573 mm³ at 8°, and 8.8602 mm³ when flat at X=-1.8. Flat X=-1.2, -0.6 and 0 positions had zero overlap. The 30° initial lowering samples were all collision-free. Do not claim battery installability from static fit alone.
Next safe step: inspect the intersection solids for this failed trajectory and search alternative translations/rotations using the existing geometry. A collision-free path might exist; none is established. If source geometry must change again, obtain authorization for an additional repair beyond the two focused geometry repair batches already used.
FDM and assembly guidance
PETG, 0.4 nozzle; 0.2 layer height PROVISIONAL; printer/build volume and calibration UNKNOWN. Prototype rationale: low-volume, accessible two-part fit/handling model. Base print rear face down/open side up, translating Z by +14.6 only in slicer. Lid print broad front face down, rotate 180° about X then translate to bed; this is not its installed transform. PCB dummy prints broad bottom face down. Battery envelope is a clearance visualization, not a cell to manufacture; hardware is purchased, not FDM printed.
Accessible support may be needed beneath four internal shelves and the 10.5 mm USB roof (above the uncalibrated 10 mm bridge fallback); right opening roof spans 8 mm. Support must be removed before battery/board installation. Avoid support on pilots, contact seats and mating surfaces. Pipeline reports down-facing faces: base 6 totaling 123.4327 mm²; lid 7 totaling 4409.1052 mm² in installed orientation, largely addressed by flipping lid for print. Build-volume fit, actual bridge quality, pilot drilling, strength, PETG creep and seam fit remain unverified. Recommend fit/pilot coupons before full print. No thermal, ingress, acoustic, drop or battery-runtime claim is made.
PROVISIONAL / Estimated register
Every package and opening value above remains PROVISIONAL/Estimated, including: 130×65×26 envelope; PCB 112×54×1.6 and reliefs; 7/2 component heights; battery 90×50×6.5; opening dimensions, radii, pitch and positions; USB body allowance; all screw/support/locator positions, nominal screw envelope, fallback pilots, bore depths and driver envelope; mating gap 0.2/side; print layer height 0.2 and bridge assumption 10. Fixed enclosure rules implemented: ordinary wall 3, floor/roof 2.4, top/bottom component clearance at least 2 in declared vertical stack, joint engagement 3, shadow line 0.5×0.5. These are modeled design dimensions, not measurements of production parts.
Cell capacity, swelling, protection, insulation, adhesive, leads, display module thickness/body, controls and acoustic assemblies, antenna clearances and thermals remain UNKNOWN. The 2–3 day runtime is only a product target and was not validated.
Handoff / repair history
Initial compilation needed a numeric-tolerance correction to a chamfer edge selector before first upload. Two subsequent focused geometry repair batches were performed: (1) perimeter screw interfaces with board and skirt, including two PCB edge reliefs and relocated screw axes; (2) right control cut axis corrected using an explicit plane. No further geometry repair is authorized by the original two-cycle budget.
Project computer enclosure-mech (mech image), working directory /root/work, retains common.py, base-body.py, lid-body.py, generate.py, repair.py, final Build123d sources, downloaded placed STEP files, scene.fluxscene, check.py, details.py, access-check.py and verification outputs. Final scene key: document_assets/hermes-pocket-ai-assistant-scene-41736c8bd3954372f531487ff7ff0b0f.fluxscene. Re-read project state before continuing. The report itself could not be read back after writing because only document-write tools remained available at ACU exhaustion.