ESP-01 Dual Servo Controller


build a two servo motor controller as beskbot left right legs using esp01 with and sg90 servo and also battry managment integrated and programable pins
Created a project doc

Two-Servo Robot Controller Requirements

View Document

Two-Servo Robot Controller Requirements User request
Build a controller for a two-legged robot, using an ESP-01 and two SG90 servos for the left and right legs, with integrated battery management and programmable pins.
Current state
The project started empty (0 components, 0 nets). No schematic, component selection, wiring, PCB layout, firmware, or verification has been performed. This document records requirements only; execution stopped because the account ran out of ACUs.
Requirements captured
  • ESP-01 Wi-Fi controller.
  • Two SG90 servos, one per leg.
  • Integrated battery management.
  • Programming access and/or user-programmable GPIO (meaning needs clarification).
Proposed direction — not yet approved or verified
I saved your ESP-01 controller requirements for two SG90 leg servos, integrated battery management, and programming access in Two-Servo Robot Controller Requirements. No components or wiring have been added yet.
Before building, I need to confirm the battery type and whether “programmable pins” means a firmware-programming header, extra GPIO, or both; schematic and PCB work require Agent mode.
Execution stopped because your ACUs ran out.
What is Agent mode?
Agent mode lets Flux build, do deep research, validate designs, and work through complex assignments.
Chat mode is just as smart and has the same engineering knowledge, but it cannot work autonomously.
Only Agent mode consumes your plan's included AI usage (measured in ACUs).
Continue in Agent Mode

Waiting for input

No schematic yet

Talk to Flux to get started.

Two-Servo Robot Controller Requirements
User request
Build a controller for a two-legged robot, using an ESP-01 and two SG90 servos for the left and right legs, with integrated battery management and programmable pins.
Current state
The project started empty (0 components, 0 nets). No schematic, component selection, wiring, PCB layout, firmware, or verification has been performed. This document records requirements only; execution stopped because the account ran out of ACUs.
Requirements captured
  • ESP-01 Wi-Fi controller.
  • Two SG90 servos, one per leg.
  • Integrated battery management.
  • Programming access and/or user-programmable GPIO (meaning needs clarification).
Proposed direction — not yet approved or verified
  • Investigate a rechargeable single-cell lithium battery architecture, with charging/protection, a servo supply converter, and a separate regulated 3.3 V ESP-01 supply.
  • Size the battery, protection, converter, connectors, and traces for simultaneous servo start/stall transients using sourced specifications.
  • Provide ESP-01 flashing access, boot-mode control, reset, and accessible ground and power references.
  • Check ESP-01 boot-strap pin behavior when assigning servo outputs. Its limited exposed GPIO may require an additional controller or PWM peripheral if extra user GPIO is required.
  • Keep servo power transients from resetting the ESP-01. Do not power SG90 servos from the ESP-01's 3.3 V rail.
Decisions needed before implementation
  1. Confirm battery type/cell count, capacity or desired runtime, and charging input (for example USB-C).
  2. Clarify whether 'programmable pins' means an ESP-01 firmware-programming header, additional user GPIO, or both.
  3. Confirm whether the robot must operate while charging; this affects the power-path architecture.
  4. Confirm board size or mounting constraints and servo connector preferences.
Next work
Resolve the power architecture and GPIO requirements, source component and servo power specifications, capture and check the schematic, then obtain confirmation before PCB layout. Firmware and mechanical leg design remain undefined in scope.
  • User request

  • Current state

  • Requirements captured

  • Proposed direction — not yet approved or verified

  • Decisions needed before implementation

  • Next work