Terminal Block Location


The protected USB breakout still cannot generate because existing copper blocks every valid connector-local geometry; I will not substitute an uncontrolled USB route. I’m completing the unrelated ground connection and then running final checks so the exact residual is clear.
The final non-USB ground airwire is routed. I’m validating the remaining six USB-only airwires and checking that the cleanup introduced no new manufacturing violations.
Autoroute is applied and retained. Placement did not need changes; all 135 non-USB connections are routed, redundant copper was removed, and no new overlap, floating-copper, invalid-layer, or protected-copper violations were found.
Open item
  • Six USB D+/D− airwires remain because existing connector-corridor copper blocks every valid protected 90 Ω breakout geometry. I did not apply an uncontrolled substitute route.
Suggested next step
  1. Rework the J1–D3 corridor placement/copper to create a valid USB differential-pair escape.
  2. Regenerate the protected USB-C breakout and route the six USB segments.
  3. Re-run final DRC and USB signal-integrity checks.
"PCB Routing Cleanup" completed.
The cleanup report matches the prior state: no stale copper remains, and the local ground route is complete. I’m doing one final live verification to confirm the six USB-only airwires are the sole remaining issue.
Reconciled and verified live: cleanup is complete, with zero redundant, dangling, floating, overlapping, invalid-layer, or protected-copper issues. The only remaining DRC errors are the same six USB D+/D− airwires, which require reworking the congested J1–D3 corridor before a valid protected 90 Ω breakout can be generated.

Board Bring-Up Plan
1. Unpowered Inspection
  • Verify U1, U2, U3/U4, U5, U6, U7, Q1, D2, and U8 orientations.
  • Confirm U1 antenna keepout is free of copper and components.
  • Confirm SW1 is absent and J7 is 8 positions.
  • Verify J7 labels: 3V3, GND, MOSI, SCK, CS, DC, RESET, BUSY.
  • Verify the D2F-01L-A1 off-board switch and J9 labels: COM/GND, NO/POWER_ON_SET_N, NC/SHUTDOWN_REQUEST_N.
  • Confirm R28=2.7 kΩ, R29=1 MΩ, R30=2.7 kΩ, R31=16.9 kΩ, C25=1 µF, C26=100 nF, and C24=10 µF.
  • Check for shorts from USB_5V_PROTECTED, SYS_PWR, POWER_ENABLE, 3V3, BAT_POS, and REF_2V5 to GND.
2. Charger and Off-State Check
  • Put the housing switch in OFF and apply current-limited USB 5 V.
  • Confirm USB_5V_PROTECTED and SYS_PWR are present but 3V3 is off.
  • Confirm the BQ24075 charges a connected protected 1S LiPo while 3V3 remains off.
  • Remove USB and measure battery off-state current. Target approximately 5.5 µA typical planning current plus battery self-discharge; investigate anything above 20 µA after settling.
3. Cold Start and Hold
  • Move SW4 to ON. Confirm Q1 gate is near 0 V, POWER_ENABLE rises, U7 starts, and 3V3 reaches 3.3 V.
  • Program minimal firmware that asserts GPIO7 POWER_HOLD immediately.
  • After boot, move SW4 to OFF. Confirm Q1 turns off, GPIO35 goes low, and 3V3 remains on because GPIO7 holds POWER_ENABLE through D2.
  • With test firmware only, drive GPIO7 low and confirm U7 and 3V3 shut down.
  • Move SW4 back to ON and confirm reliable cold restart from both battery and USB.
4. ESP32 Programming and Recovery
  • Use a 3.3 V UART adapter on J8.
  • Verify normal boot and BOOT+RESET download mode.
  • Confirm RESET remains functional with U8 RSTn connected.
  • Confirm GPIO35/36 do not affect boot straps.
  • Verify radios are disabled and CPU frequency is 80 MHz.
5. TPL5010 Failsafe
  • Confirm U8 VDD=3.3 V and RSTn is high through the existing ESP_EN pull-up after startup.
  • Run firmware that pulses GPIO36 DONE every 10 s; verify no resets for at least five minutes.
  • Stop DONE pulses with SW4 ON; expect an ESP reset after approximately 30 s, followed by reboot because Q1 still holds power.
  • Stop DONE pulses with SW4 OFF while GPIO7 is holding power; expect reset followed by complete 3V3 shutdown.
  • Confirm the watchdog does not prevent UART download/recovery; if necessary, service DONE from the bring-up image.
6. E-paper Interface
  • Connect only the Waveshare SKU 12956 module with power off.
  • Verify J7 pin order against the cable before applying power.
  • Initialize GxEPD2 on GPIO18/17/15/14/8/16; MISO and backlight are not used.
  • Confirm BUSY is high during refresh and low when complete.
  • Perform a full white/black/checkerboard test, then four quadrant labels.
  • Confirm a partial quadrant update works and is limited to about 1 Hz.
  • Perform 60 partial updates and verify the firmware forces a full refresh to clear ghosting.
  • Measure refresh rail current; expected module refresh power is about 26.4 mW typical (approximately 8 mA at 3.3 V).
7. Graceful Shutdown and Retention
  • Display four readings, then move SW4 OFF.
  • Confirm SHUTDOWN_REQUEST_N remains low after 30 ms debounce while 3V3 stays valid.
  • Confirm firmware disables muxes, chooses a stored image, performs a full refresh, waits for BUSY low, and hibernates the panel.
  • Confirm GPIO7 then releases POWER_HOLD and 3V3 falls to 0 V.
  • Leave the unit unpowered for at least one hour and verify the final image remains visible.
  • Repeat at least 20 shutdowns and confirm image selection varies and no shutdown truncates the refresh.
8. Power and Current
  • With radios disabled and all four slots scanning, record 3V3 current between e-paper updates and during partial/full refresh.
  • Expected typical 3V3 load: 53–67 mA. Design peak: 100 mA.
  • At a 3.0 V battery, design-peak battery current should remain near or below 129 mA excluding charger behavior.
  • Confirm U7 output remains stable and no component overheats.
  • Apply USB in USB500 mode and verify system operation plus reduced-rate charging.
9. ADS1120 and Mux Test
  • Read ADS1120 registers over GPIO12/11/13/10 and verify DRDY on GPIO9.
  • Verify REF_2V5 and external reference selection.
  • Confirm both muxes are disabled before address changes.
  • Exercise all four slots and four ranges; discard the first conversion after switching and use calibrated averaging.
10. Calibration and Runtime
  • Calibrate per-slot shorts and standards across 1 Ω to 10 MΩ.
  • Verify blank-slot detection and 2 × 2 display formatting.
  • Store calibration in versioned NVS with CRC.
  • Measure battery runtime with the final partial/full refresh policy. Planning expectation for a 1200 mAh cell is 16–20 hours; pass requirement remains at least 4 hours.
Pass Criteria
  • Reliable Q1 cold start, GPIO7 hold, GPIO35 request, and firmware-controlled release.
  • Watchdog can force shutdown after firmware failure when the housing switch is OFF.
  • USB charging remains active with U7 disabled.
  • Four e-paper reading regions operate with rate-limited partial refresh and periodic full refresh.
  • Final shutdown image remains visible with zero 3V3 power.
  • ESP32 programming, RESET, and BOOT recovery remain available.
  • 3V3 and REF_2V5 remain stable and the ADS1120 measurement chain meets calibration targets.
  • 1. Unpowered Inspection

  • 2. Charger and Off-State Check

  • 3. Cold Start and Hold

  • 4. ESP32 Programming and Recovery

  • 5. TPL5010 Failsafe

  • 6. E-paper Interface

  • 7. Graceful Shutdown and Retention

  • 8. Power and Current

  • 9. ADS1120 and Mux Test

  • 10. Calibration and Runtime

  • Pass Criteria